Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T07CM04788
Permit Details
Apply Date:
12/20/2007
Applicant:
N/A
Description:
NEW RETAIL BLDG
Architects:
- SILBERSCHLAG, WAYNE DAVID
Contractors:
- TRIUMPH BUILDERS SOUTHWEST LLC *C*
Permit Reviews
Permit Number - T07CM04788
Permit Status: C of o
Permit Description: NEW RETAIL BLDG
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/01/2008 | POST 3RD PARTY REVIEW | 02/13/2008 | COMPLETED |
02/13/2008 | RESUBMITTAL | 02/13/2008 | COMPLETED |
02/28/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 02/28/2008 | COMPLETED |
05/06/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 05/07/2008 | COMPLETED |
06/17/2008 | 3RD PARTY REVIEW-REVISION/OTHER-2ND | 06/19/2008 | COMPLETED |
12/20/2007 | PLANS OK TO SUBMIT - 3RD PARTY | 12/20/2007 | COMPLETED |
12/20/2007 | OTHER | 02/13/2008 | COMPLETED |
12/20/2007 | 3RD PARTY REVIEW-COMMERCIAL | 02/01/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM04788
Permit Status: C of o
Permit Description: NEW RETAIL BLDG
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/20/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM04788
Permit Description: NEW RETAIL BLDG
Total Completed Inspections - 46
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/27/2008 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* CORRECTION MADE OK OK TO COVER ALL AREAS |
02/27/2008 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1. WHY HAS THE PLUMBER STUBBED UP TWICE AT P-9 2. AT P-4 REQUIRE 2X THE PIPE DIAMETER BETWEEN THE TRAP WEIR AND THE POINT OF VENT 3. WET SOILS INDICATE A LEAK 4. SUGGEST SHOOTING FLOOR LEVEL AND UPSTREAM MANHOLE COVER TO VERIFY NEED FOR B.W VALVE 5. OK TO START BACKFILLING |
02/27/2008 | PLUMBING - BACK WATER VALVE | RMYERS | Approved | IVRS - Inspection :* |
02/29/2008 | SITE - SEWER | RMYERS | Approved | IVRS - Inspection :* |
02/29/2008 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection :* |
04/30/2008 | PLUMBING - PRE SLAB | RMYERS | Approved | IVRS - Inspection :* |
05/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | LOADING DOCK WALL OK |
05/21/2008 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* METAL ROOF SYSTEM WELDED AS PER GENERAL INSTRUCTIONS PAGE S1.1 -- OK TO COVER (SPECIAL INSPECTED) |
06/24/2008 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* |
06/26/2008 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* |
07/23/2008 | STUCCO MESH | AQUIROZ | Approved | IVRS - Inspection :* |
07/23/2008 | BUILDING ABOVE CEILING | AQUIROZ | Approved | IVRS - Inspection :* |
07/23/2008 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* |
08/06/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | TMPP CLEARED PER R. HOLLANDER |
08/08/2008 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* OK FOR CEILING TILES |
08/08/2008 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
08/11/2008 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* CLOSET FLANGES OK |
08/25/2008 | OUTDOOR LIGHTING FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
08/25/2008 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
08/25/2008 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
08/25/2008 | FIRE - FINAL | LTHOMAS | Approved | |
08/27/2008 | U VALUE FOR WINDOW | AQUIROZ | Approved | IVRS - Inspection :* |
08/28/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - OUTDOOR LIGHTING | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - TEMP POWER FOR TEST | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - UFER | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* |
08/29/2008 | NPPO - FINAL | ACONNOR | Approved | |
08/29/2008 | LANDSCAPE - FINAL | ACONNOR | Approved | |
08/29/2008 | SIGN - FINAL | JSONKIN | Approved | IVRS - Inspection :* |
09/03/2008 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL |
09/04/2008 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* |
09/04/2008 | REINFORCED MASONRY PRE-GROUT | AQUIROZ | Approved | IVRS - Inspection :* |
09/04/2008 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* |
09/04/2008 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* |
09/04/2008 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
09/04/2008 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
09/08/2008 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* |
09/08/2008 | PLUMBING - ROOF DRAINS | RMYERS | Approved | IVRS - Inspection :* |
09/10/2008 | ENGINEERING - FINAL | MRUSSO | Approved | FAX OR E-MAIL EOR BASIN CERT. |
09/11/2008 | HEALTH DEPT - FINAL 724-7908 | LGERINGER | Approved | |
09/11/2008 | PERMIT FINALED | LJACKSON | Approved |