Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2008 | ENGINEERING - FINAL | Approved | FAX OR E-MAIL EOR BASIN CERT. | |
| 09/03/2008 | ENGINEERING - FINAL | Denied | 1) PROVIDE AN APPROVED (COT) SITE AND/OR GRADING PLAN SHOWING CHANGES MADE. 2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE RET/DET BASIN WAS CONSTRUCTED PER THE APPROVED PLAN. 3) REMOVE SEDIMENT CONTROLS ALONG NORTH SIDE. 4) ADD TWO WHEEL STOPS TO PARKING ON WEST SIDE. 5) COMPLETE ROCK RIP RAP ALONG RAILING/SIDEWALK ON SE CORNER. |