Permit: T07CM04729
Permit Details
Apply Date:
12/17/2007
Applicant:
GABE LARA
Description:
NEW MANUFACTURING FACILITY
Architects:
- BOLDUC, VICTOR
Contractors:
- BARKER MORRISSEY CONTRACTING INC
Permit Reviews
Permit Number - T07CM04729
Permit Status: C of o
Permit Description: NEW MANUFACTURING FACILITY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2008 | RESUBMITTAL | 01/14/2008 | COMPLETED |
| 01/14/2008 | RESUBMITTAL | 01/14/2008 | COMPLETED |
| 02/19/2009 | 3RD PARTY REVIEW-REVISION/OTHER | 02/19/2009 | COMPLETED |
| 03/27/2009 | 3RD PARTY REVIEW-REVISION/OTHER-2ND | 06/17/2009 | COMPLETED |
| 09/16/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 09/24/2008 | COMPLETED |
| 10/24/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 10/31/2008 | COMPLETED |
| 12/17/2007 | PLANS OK TO SUBMIT - COMM | 12/17/2007 | COMPLETED |
| 12/17/2007 | 3RD PARTY REVIEW-COMMERCIAL | 12/28/2007 | COMPLETED |
| 12/28/2007 | POST 3RD PARTY REVIEW | 01/10/2008 | COMPLETED |
| 12/30/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 12/30/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM04729
Permit Status: C of o
Permit Description: NEW MANUFACTURING FACILITY
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/17/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM04729
Permit Description: NEW MANUFACTURING FACILITY
Total Completed Inspections - 40
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | TMPP CLEARED PER R. JIROUDEK |
| 09/08/2008 | ELECTRIC - CONSTRUCTION POWER | RJIROUDE | Approved | IVRS - Inspection :* OK 1" PVC FROM TEMP SERVICE TO TRAILER |
| 09/10/2008 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* OK U.G FOR FEEDERS TO PANELS & MCC & FUTURE FROM SES |
| 09/16/2008 | REINFORCED MASONRY PRE-GROUT | GDABBS | Approved | IVRS - Inspection :* TOP OUT @ NORTH 1/3 OF EAST DRAINAGE CHANNEL CMU WALL REINFORCMENT STEEL - OK TO GROUT SPECIAL INSPECTOR HAS ACCEPTED |
| 09/18/2008 | ELECTRIC - UFER | RJIROUDE | Approved | IVRS - Inspection :* |
| 09/19/2008 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* NOTE: YOU WILL BE REQUIRED TO RETEST YOUR UNDERGROUND BECAUSE ALL PIPES HAVE BEEN CUT DOWN BELOW GRADE |
| 09/19/2008 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
| 11/25/2008 | STEM WALL/RETAINING WALL | GDABBS | Approved | CMU STEM WALL @ TRASH ENCLOSURE OK SPECIAL INSPECTED |
| 12/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* 2 DOCK RECEIVING AREA CANOPY COLUMN FOOTINGS AND TWO TRUCK DOCK SUMP PITS OK SPECIAL INSPECTION APPROVED |
| 12/05/2008 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* FLOOR ELEVATION OUTSIDE DOCK RECEIVING AREA STEEL REINFORCEMENT OK SPECIAL INSPECTION APPROVED |
| 12/05/2008 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* 1. UNDERGROUND PIPING TEST FOR SUMP PUMP AT LOADING DOCK OK 2. CALL BACK FOR PRE-SLAB |
| 12/16/2008 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* OK 1 - 1 1/4" PVC FROM BUILDING TO TEMP SERVICE |
| 12/16/2008 | ELECTRIC - PROGRESS | RJIROUDE | Approved | IVRS - Inspection :* |
| 12/17/2008 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* 2" PVC SCH 40 FROM METER LOCATION STUBBED UP AND OVER TO CONNECTION TO COPPER INTO BLD. OK PENDING LETTER FROM ENGINEER GIVING OK FOR SCH40 IN PLACE OF SCH80 AS SPECIFIED ON SITE PLAN. |
| 02/18/2009 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* 1ST FLOOR COMPLETE |
| 03/05/2009 | PLUMBING - PROGRESS | RRICH | Approved | IVRS - Inspection :* |
| 03/05/2009 | PLUMBING - BACK WATER VALVE | RRICH | Approved | IVRS - Inspection :* |
| 03/05/2009 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
| 03/09/2009 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* OK FOR TILES BOTH FLOORS |
| 03/18/2009 | SITE - SEWER | RRICH | Approved | IVRS - Inspection :* |
| 03/18/2009 | ELECTRIC - TEMP POWER FOR TEST | RJIROUDE | Approved | IVRS - Inspection :* |
| 04/03/2009 | RIGHT OF WAY - FINAL | MCASTRO | Approved | PER EMAIL |
| 04/03/2009 | NPPO - FINAL | ACONNOR | Approved | |
| 04/03/2009 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 04/03/2009 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 04/03/2009 | FIRE - ALARM FINAL | LTHOMAS | Approved | |
| 04/03/2009 | FIRE - FINAL | LTHOMAS | Approved | |
| 04/07/2009 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
| 04/07/2009 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 04/08/2009 | FRAMING | GDABBS | Approved | |
| 04/08/2009 | BUILDING - PROGRESS | GDABBS | Approved | |
| 04/08/2009 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 04/08/2009 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
| 05/01/2009 | ENGINEERING - FINAL | NKALAHAR | Approved | PLAN FOR BUBBLER BOX CHANGE STAMPED BY BIANCA 4/29/09 DP STAMPED BY P GEHLEN 2/17/09 FOR REMOVAL OF WEST DRIVEWAY AND INCLUDED ACCESSIBLE ROUTE-TO BE COMPLETED IN A FUTURE PHASE |
| 06/17/2009 | SIGN - FINAL | JYBARRA | Approved | |
| 06/17/2009 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
| 06/17/2009 | OUTDOOR LIGHTING FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
| 06/17/2009 | ELECTRIC - OUTDOOR LIGHTING | RJIROUDE | Approved | IVRS - Inspection :* |
| 06/17/2009 | ELECTRIC - CABLE DROP | RJIROUDE | Approved | IVRS - Inspection :* |
| 06/17/2009 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |