| 04/08/2009 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 12/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 2 DOCK RECEIVING AREA CANOPY COLUMN FOOTINGS AND TWO TRUCK DOCK SUMP PITS OK SPECIAL INSPECTION APPROVED |
|
| 11/20/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* HORIZONTAL & VERTICAL REINFORCEMENT BARS FOR SOUTH TRUCK DOCK CONCRETE WALLS -- OK TO POUR AND EPOXY DOWELS @ PANELS #29 AND #10 @ FLOOR SLAB CONFORMATECH HAS SPECIAL INSPECTED |
|
| 11/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS FOR EAST, NORTH, WEST TRUCK DOCK WALLS AND TRASH ENCLOSURE OK -- SPECIAL INSPECTED |
|
| 10/31/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT UP WALL PANELS #9, 21, 22, 23, 24, 25, 26, 27 & 29 REINFORCEMENT STEEL & EMBEDS SPECIAL INSPECTOR HAS ACCEPTED -- OK TO POUR |
|
| 10/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 10/24/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT UP WALL PANEL STEEL REINFORCEMENT ON PANELS #15 THRU #20, #28 & #30 INCLUDING EMBEDS & PICK POINTS CONFORMA TECH APPROVED |
|
| 10/23/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 10/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TILT PANELS #1 THRU #6 -- OK BY SPECIAL INSPECTOR WAITING ON LEDGER ANGLES TO BE DELIVERED |
|
| 09/26/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. EXTERIOR WALL FOOTING @ GRID G.0/1.0 TO 6.0 AND 1.0/F.0 TO G.0 2. COLUMN FOOTINGS @ F.0/1.0 AND F.3/1.0 -- OK SPECIAL INSPECTION ACCEPTED |
|
| 09/16/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SPREAD COLUMN FOOTINGS @ GRID LINES D.0/6.0, E.0/6.0 AND F.0/6.0 -- OK TO POUR AND EXTERIOR WALL CONTINUOUS FOOTING @ GRID 6.0/FROM C.5 TO F.8 - SPECIAL INSPECTOR HAS ACCEPTED |
|
| 09/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SPREAD COLUMN FOOTINGS @ GRID LINES D.0/3.0, D.0/4.0, B.0/6.0 & C.0/6.0 AND CONTINUOUS WALL FOOTING @ GRID LINES A.0/4.0 TO 6.0 AND 6.0/A.0 TO C.1 - SPECIAL INSPECTOR HAS ACCEPTED |
|
| 09/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SPREAD COLUMN FOOTINGS @ GRID LINES 1.0/B.0, 1.0/E.0, 1.0/D.0, 1.0/C.0, 1.0/E.7 & 1.0/F.4 AND CONTINOUS WALL FOOTING @ GRID LINES 1.0/A.0 TO G.0 AND A.0/1.0 TO 4.0 SPECIAL INSPECTOR HAS ACCEPTED |
|
| 09/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 09/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN SPREAD FOOTING @ GRID LINES F.0/4.0, E.0/4.0, F.5/4.5, E.7/4.5, C.0/4.0, B.0/4.0, F.6/6.0, E.7/6.0, F.5/7.3, F.5/8.8, F.0/7.7, E.0/7.7, C.0/7.7, B.0/7.7, E.7/7.5 AND E.7/8.9 -- OK TO POUR SPECIAL INSPECTION COMPLETED |
|
| 09/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WEST RETAINING WALL/SITE WALL FOOTING - SPECIAL INSPECTOR, CONFORMATECH HAS APPROVED |
|
| 09/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* DRAIN CULVERT OK TO PLACE CONCRETE WHEN CONFORMA-TECH VERIFIES COMPLETION OF STEEL |
|
| 08/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* RAINED OUT CONTRACTOR CANCELED |
|
| 08/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* DRAINAGE RETAINING WALL FOOTING ALONG EAST EDGE OF PROPERTY 420 L.F - SPECIAL INSPECTION PERFORMED BY CONFORMATECH OK TO POUR |