Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2009 | ENGINEERING - FINAL | Approved | PLAN FOR BUBBLER BOX CHANGE STAMPED BY BIANCA 4/29/09 DP STAMPED BY P GEHLEN 2/17/09 FOR REMOVAL OF WEST DRIVEWAY AND INCLUDED ACCESSIBLE ROUTE-TO BE COMPLETED IN A FUTURE PHASE |
|
| 04/02/2009 | ENGINEERING - FINAL | Partial Approval | NO CONCERNS FOR TEMP C OF O H/C PARKING NEEDS SIGNS AND WHEEL STOPS BIKE LOCKERS NOT INSTALLED YET ADDRESS PONDING AT NW CORNER OF BLDG PROVIDE STAMPED PLAN W/ BUBBLER BOX CHANGE PROVIDE STAMPED PLAN FOR PHASING OF W DRIVEWAY (TO INCLUDE PREVIOUS ACCESSIBLE ROUTE) |