Permit: T07CM01410
Permit Details
Apply Date:
04/04/2007
Applicant:
N/A
Description:
NEW HANGER
Architects:
- MCDOWELL, ARTHUR JERRY
Contractors:
- FLEMING WEST BUILDING CO INC
Permit Reviews
Permit Number - T07CM01410
Permit Status: C of o
Permit Description: NEW HANGER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/04/2007 | PLANS OK TO SUBMIT - 3RD PARTY | 06/26/2007 | COMPLETED |
04/17/2007 | PLANS OK TO SUBMIT - SITE | 07/02/2007 | COMPLETED |
06/26/2007 | 3RD PARTY REVIEW-COMMERCIAL | 06/26/2007 | COMPLETED |
06/26/2007 | POST 3RD PARTY REVIEW | 07/02/2007 | COMPLETED |
07/02/2007 | RESUBMITTAL | 07/11/2007 | COMPLETED |
07/11/2007 | OTHER | 07/13/2007 | COMPLETED |
10/24/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 11/09/2007 | COMPLETED |
11/09/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 01/17/2008 | COMPLETED |
11/13/2007 | REVISION - - 2ND | 11/13/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07CM01410
Permit Status: C of o
Permit Description: NEW HANGER
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/04/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T07CM01410
Permit Description: NEW HANGER
Total Completed Inspections - 34
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2007 | PLUMBING - SEWER HCS CONNECT | RLEDONNE | Approved | IVRS - Inspection :* |
09/11/2007 | TEP CLEARANCE - AM | BFLORES | Approved | TEC PER D.SANTA CRUZ |
09/12/2007 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* FOOTING @ HANGER DOORS PER G/S3.1 |
09/12/2007 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* |
09/14/2007 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* |
10/23/2007 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | IVRS - Inspection :* |
10/24/2007 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* OK SECONDARYS FROM X-FORMER TO SES |
11/08/2007 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* |
11/16/2007 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* |
11/16/2007 | PLUMBING - GAS PRESSURE TEST | RLEDONNE | Approved | IVRS - Inspection :* |
11/29/2007 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* 1. YOU MUST PROVIDE FIRESTOP SYSTEM FOR ALL PENETRATIONS OF 2 & 3 HR WALLS 2. OK TO TAPE - EXCEPT DO NOT TAPE AROUND PENETRATIONS |
12/18/2007 | ELECTRIC - CONSTRUCTION POWER | DSANTACR | Approved | IVRS - Inspection :* 1. BOND BLD STEEL, WATER, GAS, X-FORMER 2. COMPLETE FIXTURE SEISMIC WIRES 3. MAIN BOND JUMPER FOR SERVICE DISCONNECT 4. RECEIVED LETTER FOR USE OF MC CABLE |
12/18/2007 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
12/19/2007 | BUILDING ABOVE CEILING | LHANLY | Approved | IVRS - Inspection :* 1. SUPPORT ALL ELECTRICAL EQUIPMENT PER CODE 2. SUPPORT ALL MECH PER CODE 3. FIRESTOP REQUIRED ABOVE CEILING 4. MECH. INSPECTOR NEEDS TO LOOK AT VENT DAMPER FOR RETAINING RINGS OK TO PLACE TILE WHEN ELEC & MECH INSPECTORS SAY OK PLEASE LEAVE SOME TILES OUT FOR FIRESTOP INSPECTION |
12/27/2007 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) UNTANGLE FIXTURE WHIPS AND UN-TIE KNOTS 2) FILL UNUSED OPENINGS IN BOXES 3) GROUND JUNCTION BOXES 4) BOX OVER FILLED 5) SECURELY ATTACH ALL FIXTURES TO GRID 6) SUPPORT CONDUITS PER CODE 7) WHERE ARE SEALS PER 513.9 ? |
12/27/2007 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
12/27/2007 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :$ |
01/23/2008 | PLUMBING - ABOVE CEILING | RLEDONNE | Approved | IVRS - Inspection :* |
02/05/2008 | PLUMBING - GAS PRESS TEST FNL | RLEDONNE | Approved | IVRS - Inspection :* |
02/05/2008 | PLUMBING - MD GAS/PRECONST MTG | RLEDONNE | Approved | IVRS - Inspection :* |
02/08/2008 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL |
02/08/2008 | NPPO - FINAL | ACONNOR | Approved | N/A |
02/08/2008 | LANDSCAPE - FINAL | ACONNOR | Approved | N/A |
02/08/2008 | SIGN - FINAL | JSONKIN | Approved | |
02/14/2008 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
02/28/2008 | FIRE - FINAL | LTHOMAS | Approved | |
02/29/2008 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
02/29/2008 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :* |
02/29/2008 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
03/10/2008 | ENGINEERING - FINAL | MAVERY | Approved | Contractor addressed punch list. |
03/10/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* DUCT SMOKE DETECTOR TESTED OK SEE BUILDING INSPECTOR FOR C OF O |
03/10/2008 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | |
03/17/2008 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* APPROVED FIRESTOP SYSTEM ATTACHED |
03/18/2008 | PERMIT FINALED | GDABBS | Approved |