Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
04/04/2007
Applicant:
N/A
Description:
NEW HANGER
Architects:
  • MCDOWELL, ARTHUR JERRY
Contractors:
  • FLEMING WEST BUILDING CO INC

Permit Reviews

Permit Number - T07CM01410
Permit Status: C of o
Permit Description: NEW HANGER
Start Date Submittal Complete Date Status  
04/04/2007 PLANS OK TO SUBMIT - 3RD PARTY 06/26/2007 COMPLETED Review Details
04/17/2007 PLANS OK TO SUBMIT - SITE 07/02/2007 COMPLETED Review Details
06/26/2007 3RD PARTY REVIEW-COMMERCIAL 06/26/2007 COMPLETED Review Details
06/26/2007 POST 3RD PARTY REVIEW 07/02/2007 COMPLETED Review Details
07/02/2007 RESUBMITTAL 07/11/2007 COMPLETED Review Details
07/11/2007 OTHER 07/13/2007 COMPLETED Review Details
10/24/2007 3RD PARTY REVIEW-REVISION/OTHER 11/09/2007 COMPLETED Review Details
11/09/2007 3RD PARTY REVIEW-REVISION/OTHER 01/17/2008 COMPLETED Review Details
11/13/2007 REVISION - - 2ND 11/13/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07CM01410
Permit Status: C of o
Permit Description: NEW HANGER
Total Outstanding Activity Conditions - 1
Date Name
04/04/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T07CM01410
Permit Description: NEW HANGER
Total Completed Inspections - 34
Date Description Inspector Results Comments
09/11/2007 PLUMBING - SEWER HCS CONNECT RLEDONNE Approved IVRS - Inspection :*
09/11/2007 TEP CLEARANCE - AM BFLORES Approved TEC PER D.SANTA CRUZ
09/12/2007 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection :*
FOOTING @ HANGER DOORS PER G/S3.1
09/12/2007 PLUMBING - PRE SLAB RLEDONNE Approved IVRS - Inspection :*
09/14/2007 BUILDING PRE-SLAB GDABBS Approved IVRS - Inspection :*
10/23/2007 PLUMBING - ROUGH, SOIL RLEDONNE Approved IVRS - Inspection :*
10/24/2007 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
OK SECONDARYS FROM X-FORMER TO SES
11/08/2007 PLUMBING - INTERMEDIATE RLEDONNE Approved IVRS - Inspection :*
11/16/2007 PLUMBING - YARD WTR LINE/TEST RLEDONNE Approved IVRS - Inspection :*
11/16/2007 PLUMBING - GAS PRESSURE TEST RLEDONNE Approved IVRS - Inspection :*
11/29/2007 SHEET ROCK NAILING LHANLY Approved IVRS - Inspection :*
1. YOU MUST PROVIDE FIRESTOP SYSTEM FOR ALL PENETRATIONS OF 2 & 3 HR WALLS
2. OK TO TAPE - EXCEPT DO NOT TAPE AROUND PENETRATIONS
12/18/2007 ELECTRIC - CONSTRUCTION POWER DSANTACR Approved IVRS - Inspection :*
1. BOND BLD STEEL, WATER, GAS, X-FORMER
2. COMPLETE FIXTURE SEISMIC WIRES
3. MAIN BOND JUMPER FOR SERVICE DISCONNECT
4. RECEIVED LETTER FOR USE OF MC CABLE
12/18/2007 ELECTRIC - UFER DSANTACR Approved IVRS - Inspection :*
12/19/2007 BUILDING ABOVE CEILING LHANLY Approved IVRS - Inspection :*
1. SUPPORT ALL ELECTRICAL EQUIPMENT PER CODE
2. SUPPORT ALL MECH PER CODE
3. FIRESTOP REQUIRED ABOVE CEILING
4. MECH. INSPECTOR NEEDS TO LOOK AT VENT DAMPER FOR RETAINING RINGS

OK TO PLACE TILE WHEN ELEC & MECH INSPECTORS SAY OK
PLEASE LEAVE SOME TILES OUT FOR FIRESTOP INSPECTION
12/27/2007 ELECTRIC - ABOVE CEILING RHOLLAND Approved IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
1) UNTANGLE FIXTURE WHIPS AND UN-TIE KNOTS
2) FILL UNUSED OPENINGS IN BOXES
3) GROUND JUNCTION BOXES
4) BOX OVER FILLED
5) SECURELY ATTACH ALL FIXTURES TO GRID
6) SUPPORT CONDUITS PER CODE
7) WHERE ARE SEALS PER 513.9 ?
12/27/2007 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
12/27/2007 ELECTRIC - ABOVE CEILING RHOLLAND Approved IVRS - Inspection :$
01/23/2008 PLUMBING - ABOVE CEILING RLEDONNE Approved IVRS - Inspection :*
02/05/2008 PLUMBING - GAS PRESS TEST FNL RLEDONNE Approved IVRS - Inspection :*
02/05/2008 PLUMBING - MD GAS/PRECONST MTG RLEDONNE Approved IVRS - Inspection :*
02/08/2008 RIGHT OF WAY - FINAL MOTERO Approved PER EMAIL
02/08/2008 NPPO - FINAL ACONNOR Approved N/A
02/08/2008 LANDSCAPE - FINAL ACONNOR Approved N/A
02/08/2008 SIGN - FINAL JSONKIN Approved
02/14/2008 MECHANICAL - ABOVE CEILING MRAMBER Approved IVRS - Inspection :*
02/28/2008 FIRE - FINAL LTHOMAS Approved
02/29/2008 FRAMING LHANLY Approved IVRS - Inspection :*
02/29/2008 ROOF NAILING LHANLY Approved IVRS - Inspection :*
02/29/2008 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
03/10/2008 ENGINEERING - FINAL MAVERY Approved Contractor addressed punch list.
03/10/2008 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
DUCT SMOKE DETECTOR TESTED OK SEE BUILDING INSPECTOR FOR C OF O
03/10/2008 MECHANICAL - INTERMEDIATE MRAMBER Approved
03/17/2008 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
APPROVED FIRESTOP SYSTEM ATTACHED
03/18/2008 PERMIT FINALED GDABBS Approved

Documents

File Name Document Type  
C OF O_03-18-2008.TIF CERT OF OCC VIEW
FIELDREPORTS.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW
T07CM01410_001.TIF CONSTRPLANS VIEW
T07CM01410_002.TIF CONSTRPLANS VIEW
T07CM01410_003.TIF CONSTRPLANS VIEW
T07CM01410_004.TIF CONSTRPLANS VIEW
T07CM01410_005.TIF CONSTRPLANS VIEW
T07CM01410_006.TIF CONSTRPLANS VIEW
T07CM01410_007.TIF CONSTRPLANS VIEW
T07CM01410_008.TIF CONSTRPLANS VIEW
T07CM01410_01.TIF CONSTRPLANS VIEW
T07CM01410_02.TIF CONSTRPLANS VIEW
T07CM01410_03.TIF CONSTRPLANS VIEW
T07CM01410_01.TIF CONSTRPLANS VIEW
T07CM01410_02.TIF CONSTRPLANS VIEW
T07CM01410_03.TIF CONSTRPLANS VIEW
T07CM01410_04.TIF CONSTRPLANS VIEW
T07CM01410_05.TIF CONSTRPLANS VIEW
T07CM01410_06.TIF CONSTRPLANS VIEW
T07CM01410_07.TIF CONSTRPLANS VIEW
T07CM01410_08.TIF CONSTRPLANS VIEW
T07CM01410_09.TIF CONSTRPLANS VIEW
T07CM01410_10.TIF CONSTRPLANS VIEW
T07CM01410_11.TIF CONSTRPLANS VIEW
T07CM01410_12.TIF CONSTRPLANS VIEW
T07CM01410_13.TIF CONSTRPLANS VIEW
T07CM01410_14.TIF CONSTRPLANS VIEW
T07CM01410_15.TIF CONSTRPLANS VIEW
T07CM01410_16.TIF CONSTRPLANS VIEW
T07CM01410_17.TIF CONSTRPLANS VIEW
T07CM01410_18.TIF CONSTRPLANS VIEW
T07CM01410_19.TIF CONSTRPLANS VIEW
T07CM01410_20.TIF CONSTRPLANS VIEW
T07CM01410_21.TIF CONSTRPLANS VIEW
T07CM01410_22.TIF CONSTRPLANS VIEW
T07CM01410_23.TIF CONSTRPLANS VIEW
T07CM01410_24.TIF CONSTRPLANS VIEW
T07CM01410_25.TIF CONSTRPLANS VIEW
T07CM01410_26.TIF CONSTRPLANS VIEW
T07CM01410_27.TIF CONSTRPLANS VIEW
None CONSTRPLANS VIEW