Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2008 | ENGINEERING - FINAL | Approved | Contractor addressed punch list. | |
| 02/08/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1. Remove dumpster from site 2. Remove Port-a-Potty from site 3. Close out Grading Permit 4. Scupper all down spouts under sidewalks 5. Provide 2 1/2' between wheel stops 6. Install H.C signage 7. Blackout parking strips in travel lanes 8. Have all changes to approved drawing approved at 201 N. Stone |