Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
02/16/2007
Applicant:
JOSE TERAN M3 ENGINEERING
Description:
NEW MAINTENANCE BUILDING SITE IMPROVEMENTS BUILDING # 1
Architects:
  • MULLIGAN, DENNIS MYLES
Contractors:
  • LANG WYATT CONSTRUCTION ,

Permit Reviews

Permit Number - T07CM00650
Permit Status: C of o
Permit Description: NEW MAINTENANCE BUILDING SITE IMPROVEMENTS BUILDING # 1
Start Date Submittal Complete Date Status  
02/15/2008 3RD PARTY REVIEW-REVISION/OTHER 02/20/2008 COMPLETED Review Details
02/16/2007 PLANS OK TO SUBMIT - SITE 02/16/2007 COMPLETED Review Details
02/16/2007 PLANS OK TO SUBMIT - COMM 02/16/2007 COMPLETED Review Details
02/16/2007 SITE 06/06/2007 COMPLETED Review Details
02/16/2007 3RD PARTY REVIEW-COMMERCIAL 04/17/2007 COMPLETED Review Details
04/10/2008 3RD PARTY REVIEW-REVISION/OTHER 04/14/2008 COMPLETED Review Details
04/17/2007 POST 3RD PARTY REVIEW 06/06/2007 COMPLETED Review Details
06/21/2007 RESUBMITTAL 07/31/2007 COMPLETED Review Details
06/21/2007 RESUBMITTAL - SITE 07/31/2007 COMPLETED Review Details
09/04/2007 POST 3RD PARTY REVIEW 09/06/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07CM00650
Permit Status: C of o
Permit Description: NEW MAINTENANCE BUILDING SITE IMPROVEMENTS BUILDING # 1
Total Outstanding Activity Conditions - 1
Date Name
02/16/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T07CM00650
Permit Description: NEW MAINTENANCE BUILDING SITE IMPROVEMENTS BUILDING # 1
Total Completed Inspections - 44
Date Description Inspector Results Comments
12/20/2007 SITE - SEWER RLEDONNE Approved IVRS - Inspection :*
1. PROVIDE VERIFICATION OF GRADE
2. BENCH IN MANHOLE OK
12/21/2007 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
1) OK UNDER SLAB HOME RUNS OFFICE AREA LUNCH ROOM, OK SECONDARY STUB UP INTO SES
12/27/2007 PLUMBING - ROUGH, SOIL RLEDONNE Approved IVRS - Inspection :*
02/19/2008 PLUMBING - PRE SLAB RLEDONNE Approved IVRS - Inspection :*
06/02/2008 ROOF NAILING MHENSON Approved IVRS - Inspection :*
07/11/2008 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
08/13/2008 EXT METAL CLIPS/EXT SHEATHING MHENSON Approved
10/14/2008 FRAMING MHENSON Approved IVRS - Inspection :*
10/20/2008 SHEET ROCK NAILING MHENSON Approved IVRS - Inspection :*
10/21/2008 U VALUE FOR WINDOW MHENSON Approved IVRS - Inspection :*
10/21/2008 BUILDING ABOVE CEILING MHENSON Approved IVRS - Inspection :*
10/24/2008 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED PER D. SANTACRUZ
10/31/2008 MECHANICAL - ABOVE CEILING MRAMBER Approved IVRS - Inspection :*
PROVIDE PROPER FILTER ASSEMBLY
SECONDARY DRAIN RUNNING UPHILL
OK FOR TILES
11/03/2008 PLUMBING - ABOVE CEILING RLEDONNE Approved IVRS - Inspection :*
11/18/2008 ELECTRIC - UFER DSANTACR Approved IVRS - Inspection :*
TIE IN CIRCUIT GROUNDING TO POLE
11/18/2008 ELECTRIC - OUTDOOR LIGHTING DSANTACR Approved IVRS - Inspection :*
11/18/2008 ELECTRIC - CABLE DROP DSANTACR Approved IVRS - Inspection :*
11/18/2008 ELECTRIC - ABOVE CEILING DSANTACR Approved IVRS - Inspection :*
11/18/2008 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
11/19/2008 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection :*
2 LIGHT POLE BASES @ SOUTH ENTRANCE
11/20/2008 PLUMBING - GAS PRESSURE TEST RLEDONNE Approved IVRS - Inspection :*
11/20/2008 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
11/20/2008 FIRE SPKLR - FINAL LTHOMAS Approved
11/20/2008 FIRE - ALARM FINAL LTHOMAS Approved
11/20/2008 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
11/20/2008 FIRE - FINAL LTHOMAS Approved
11/25/2008 PLUMBING - INTERMEDIATE RLEDONNE Approved IVRS - Inspection :*
11/26/2008 PLUMBING - YARD WTR LINE/TEST RLEDONNE Approved IVRS - Inspection :*
1) COMPLETE INSTALL AND ? ALL BACKFLOW PROTECTION
11/26/2008 PLUMBING - SEWER HCS CONNECT RLEDONNE Approved IVRS - Inspection :*
11/26/2008 PLUMBING - GAS PRESS TEST FNL RLEDONNE Approved IVRS - Inspection :*
11/26/2008 PLUMBING - ROOF DRAINS RLEDONNE Approved IVRS - Inspection :*
12/04/2008 MECHANICAL - INTERMEDIATE MRAMBER Approved
12/04/2008 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
1. ALL LIFE SAFETY ISSUES OBSERVED SEE BUILDING INSPECTOR FOR TEMP C OF O
2. PROVIDE FLEX CONNECTORS ON GAS PIPING PER (11) PL501
3. ISOLATE COPPER "T's" ON ROOF
4. PROVIDE GAS PIPING SUPPORT ON WATER HEATER
5. PROVIDE VENT PIPING INSTALLATION INSTRUCTIONS ON WATER HEATER 90%
6. PROVIDE AIR BALANCE REPORT
7. DUCT SMOKE DETECTOR TEST OK X5
12/09/2008 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
1. REPAIR LEAK AT SINKS
2. PROVIDE BACKFLOW CERT. FOR ICE MAKER IN BREAKROOM
3. INSTALL ALL BACKFLOWS
4. COMPLETE LIST FROM 11/28/2008
12/09/2008 BUILDING - FINAL MHENSON Approved IVRS - Inspection :*
1. FIRE SPRINKLER, C OF O, ALARM APPROVED
2. SPOKE WITH TRADES E, P, M OK WITH TEMP C OF O
3. OK FOR TEMP C OF O WITH ENGINEERING
12/09/2008 ENGINEERING - FINAL MAVERY Approved Contractor needs to complete punch list. (See Below)
PRELIM PUNCH LIST. CONTRACTOR NEEDS TO ADDRESS ITEMS AND CALL IN FOR RE-INSPECTION.
1- Complete all grading activity.
2- Provide site cert from engineer, per C.O.T. D.M. chapter XIV, section 14.2(7).
3- Pin down all wheel stops.
4- Provide wheel stops for north building parking.
5- Stabilize all areas distrubed by construction.
6- Complete all sidewalk work.
7- Complete retention/detention basin.
8- Complete all drainage and drainage structures.
9- Install all bollers for trash enclosures.
10- Clean all wash out on site.
11- Grade basin to drain.
12- Have engineer address all slopes steeper then 3 to 1.
13- Keep all SWPPP controls in working order until all areas stabilized.
14- Engineer needs to provide approved revised drawing showing all changes to drainage.
15- Address all erosion on site.
16- Complete all construction around building.
17- Backfill all open holes.
18- Remove all port-a-pottys from site.
19- Address holes southwest corner of project.
20- Install all traffic islands.
21- Complete all striping.
22- Complete outlet for basin, per approved drawings.
12/12/2008 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
12/15/2008 OUTDOOR LIGHTING FINAL DSANTACR Approved
12/15/2008 ELECTRIC - TEMP POWER FOR TEST DSANTACR Approved
05/06/2009 RIGHT OF WAY - FINAL LLOPEZ Approved PER EMAIL
05/06/2009 SIGN - FINAL JYBARRA Approved
06/12/2009 BUILDING PRE-SLAB MHENSON Approved
06/12/2009 REINFORCED MASONRY PRE-GROUT MHENSON Approved
08/14/2009 PERMIT FINALED DROBERTS Approved