Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T07CM00650

Parcel: 140430130

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T07CM00650

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
06/12/2009 EXCAVATION/LAYOUT REBAR & ZON Approved
11/19/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
2 LIGHT POLE BASES @ SOUTH ENTRANCE
11/07/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1. TOP #3 RINGS SPACED 3" AT TOP 4
2. 3" CLEARANCE FROM DIRT
07/29/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
EQUIPMENT PAD 7 ON SB501 (CHILLER PAD)
05/19/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
OK TO POUR MECH & ELEC PADS 4 @ E2
BAT 1
CAT 3
05/16/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK TO POUR COMPRESSOR AND BOILER PAD
05/15/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
04/14/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
NEEDS ENGINEERED STAMPED RFI REQUIRING SPECIAL INSPECTIONS FOR BOLTS
02/19/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
A-C/1-3
02/15/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CANCELED BY CONTRACTOR
01/31/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
F TO C 4.9 TO 9
B TO C 9 TO 7.4
NEEDS PINS AT COLUMNS ON 4.9
01/29/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
TERRACON SPECIAL INSPECTION
J TO G 5.8-6, 6-7.3, 7.3-9
01/28/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CANCELED BY CONTRACTOR
01/25/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
OK TO POUR LINE J-N/3-8
TERRACON SPECIAL
01/23/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CANCELLED BY CONTRACTOR
01/22/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
01/15/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
PARTIAL COLUMNS C/8, N/5.8, M/3 OK TO POUR
TERRACON SPECIAL INSP. S. AUBA
01/09/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
ADD #3 RINGS NOT SPACED PER PLAN
COLUMN R/8, N/5.8, M/3 RECALL WHEN TUBES SET
01/04/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTINGS N-5.8, M-3, R-8
TERACON SPECIAL INSP. R. STEPHENSON
11/19/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
F2 FOOTINGS K THRU N AREA
11/14/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING REINFORCING STEEL @ GRID LINES:
3/F-3/G-3/H-3/I-F/4.7-9/H-9/G-B/7 TO 7.2
D/9-E/6-E/7.2-G/5.8-H/7.2-K/5.8-L/7.2-9/F
E/4.7-D/4.7-C/4 TO 4.7 - C/3-C/2-C/1-B/9-E/9
D/7.2-F/7.2-G/7.2-J/5.8-K/7.2-A/1-A/2-A/3-A/4
A/5-A/6-A/7-C/9-B/4.7 TO 5 - C/7.2-F/5.8
H/5.8-J/7.2-L/5.8 OK TO POUR