Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
11/07/2006
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
NEW THEATRE
Architects:
  • DANIEL, KIP EWING
Contractors:
  • VRATSINAS CONSTRUCTION COMPANY ,

Permit Reviews

Permit Number - T06CM05782
Permit Status: C of o
Permit Description: NEW THEATRE
Start Date Submittal Complete Date Status  
01/15/2008 3RD PARTY REVIEW-REVISION/OTHER 02/26/2008 COMPLETED Review Details
02/14/2008 POST 3RD PARTY REVIEW 02/22/2008 COMPLETED Review Details
02/19/2009 REVISION - - 1ST 02/23/2009 ACTIVE Review Details
02/26/2008 POST 3RD PARTY REVIEW 02/26/2008 COMPLETED Review Details
04/17/2008 3RD PARTY REVIEW-REVISION/OTHER 04/21/2008 COMPLETED Review Details
06/18/2007 POST 3RD PARTY REVIEW 06/27/2007 COMPLETED Review Details
06/27/2007 RESUBMITTAL 09/27/2007 COMPLETED Review Details
11/07/2006 PLANS OK TO SUBMIT - 3RD PARTY 11/16/2006 COMPLETED Review Details
11/16/2006 3RD PARTY REVIEW-COMMERCIAL 06/18/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM05782
Permit Status: C of o
Permit Description: NEW THEATRE
Total Outstanding Activity Conditions - 1
Date Name
11/07/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T06CM05782
Permit Description: NEW THEATRE
Total Completed Inspections - 50
Date Description Inspector Results Comments
08/29/2007 ELECTRIC - UFER DSANTACR Approved IVRS - Inspection :*
10/01/2007 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*
OK WIRING METHOD FOR TILT UP CONCRETE PANELS
TYP. OF ALL PANELS
11/14/2007 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
OK ROUGH MARQUEE SIGNS MEZZANINE
11/28/2007 PLUMBING - ROUGH, SOIL RLEDONNE Approved IVRS - Inspection :*
LOADING AREA RETEST OK
12/11/2007 PLUMBING - PRE SLAB RLEDONNE Approved IVRS - Inspection :*
HAVE CONTRACTOR ON SITE FOR INSPECTION
12/20/2007 BUILDING PRE-SLAB AQUIROZ Approved IVRS - Inspection :*
MEZZANINE 2ND FLOOR AT ELEVATOR AREA OK
12/20/2007 EXCAVATION/LAYOUT REBAR & ZON AQUIROZ Approved IVRS - Inspection :*
TRASH ENCLOSURE
12/26/2007 ELECTRIC - TEMPORARY SERVICE RHOLLAND Approved IVRS - Inspection :*.
1) TIGHTEN ALL CONDUCTORS TO LUGS
2) DO NOT STACK LUGS
3) BRACE CONDUCTORS PER MANUFACTURERS REQUIREMENTS
4) FILL UNUSED OPENINGS IN DISCONNECTS
5) INSTALL NEUTRALS TO MAIN DISCONNECTS PER PLANS AND CODE
6) INSTALL MAIN BONDING JUMPERS
7) CANNOT TRIM CONDUCTORS
8) RISERS NOT PER PLANS
9) PLEASE VERIFY INSPECTIONS OF CONDUCTORS TO BLDG
10) ONLY ONE CONDUCTOR PER LUG
11) CANNOT USE SHEET METAL THREAD SCREWS FOR GROUNDING 250.8
12) NEED PHYSICAL PROTECTION FOR #8 ? AND UN-COVER GROUND RODS
13) FINISH INTERIOR
12/26/2007 REINFORCED MASONRY PRE-GROUT JBURGE Approved IVRS - Inspection :*
1) #2: 6 AT COLUMNS AT 4' SW; 2 AT PILLARS AT 4' EAST SIDE #3: 6 AT COLUMNS AT 4'-WEST AND SW; 2 AT PILLARS AT 4' EAST SIDE-OK TO GROUT PROGRESS AREAS
04/02/2008 TEP CLEARANCE - AM BFLORES Approved TEC PER D.SANTA CRUZ
04/16/2008 PLUMBING - GAS PRESSURE TEST RLEDONNE Approved IVRS - Inspection :*
SOAP TEST FROM VALVES AT UNIT TO ALL UNITS ON ROOF
04/28/2008 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
04/28/2008 FRAMING AQUIROZ Approved IVRS - Inspection :*
04/28/2008 FIRE SPKLR - UG, PIPING, HYDRO CSCHULTZ Approved
04/30/2008 MECHANICAL - PROGRESS MRAMBER Approved IVRS - Inspection :*
04/30/2008 MECHANICAL - HOODS MRAMBER Approved IVRS - Inspection :*
04/30/2008 MECHANICAL - ABOVE CEILING MRAMBER Approved IVRS - Inspection :*
04/30/2008 MECHANICAL - INTERMEDIATE MRAMBER Approved IVRS - Inspection :*
04/30/2008 MECHANICAL - FINAL MRAMBER Approved IVRS - Inspection :*
05/01/2008 ROOF NAILING AQUIROZ Approved IVRS - Inspection :*
05/01/2008 PLUMBING - PROGRESS RLEDONNE Approved IVRS - Inspection :*
05/01/2008 PLUMBING - ROOF DRAINS RLEDONNE Approved IVRS - Inspection :*
05/01/2008 PLUMBING - ABOVE CEILING RLEDONNE Approved IVRS - Inspection :*
05/01/2008 PLUMBING - INTERMEDIATE RLEDONNE Approved IVRS - Inspection :*
05/01/2008 ELECTRIC - OUTDOOR LIGHTING DSANTACR Approved IVRS - Inspection :*
05/01/2008 ELECTRIC - CONSTRUCTION POWER DSANTACR Approved IVRS - Inspection :*
05/01/2008 ELECTRIC - PROGRESS DSANTACR Approved IVRS - Inspection :*
05/01/2008 ELECTRIC - ABOVE CEILING DSANTACR Approved IVRS - Inspection :*
05/02/2008 FIRE - ALARM FINAL DRAMIREZ Approved Approved 5/2/08.
05/05/2008 SIGN - FINAL JYBARRA Approved IVRS - Inspection :* TEMP C/O MUST PAY $62.50 FOR BANNER THAT HAS BEEN ON SITE AND MUST FINAL ALL SIGNS ON SITE FOR ELEC T08OT00561
05/05/2008 HEALTH DEPT - FINAL 724-7908 BROWNING Approved PER INSP REPORT
05/05/2008 FIRE SPKLR - FINAL LTHOMAS Approved
05/06/2008 RIGHT OF WAY - FINAL THARVISO Approved
05/07/2008 BUILDING ABOVE CEILING AQUIROZ Approved IVRS - Inspection :*
05/08/2008 PLUMBING - FINAL RLEDONNE Approved
05/08/2008 PLUMBING - GAS PRESS TEST FNL RLEDONNE Approved
05/08/2008 PLUMBING - YARD WTR LINE/TEST RLEDONNE Approved
06/04/2008 NPPO - FINAL ACONNOR Approved
06/04/2008 LANDSCAPE - FINAL ACONNOR Approved
06/04/2008 ENGINEERING - FINAL JFEMLING Approved Need to complete items 10, 11 on punch list dated 5/5.
06/05/2008 FIRE - FINAL CSCHULTZ Approved EXIT SIGNS IN PLACE THEATHER'S #6 - 11 - 12 - 13 - 15 - 16.
Ceiling tiles in projector room area, are now in place.
3.) Provide exit discharge landing (sidewalk) leading out of theater. All landings are poured.
07/08/2008 U VALUE FOR WINDOW LHANLY Approved
07/08/2008 STUCCO MESH LHANLY Approved
07/08/2008 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved
07/08/2008 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved
10/01/2008 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :*
OK #12 EXPOSED CONDUCTORS

1. SIGN READER BOARD HAS CORD THROUGH WALLS AND ABOVE CEILINGS
2. PLAN REVISIONS TO BE FOR NEON ON BUILDING AND NEW LIGHTS ON BLADE

ALSO, NEED LIGHTING CALCULATION PER OUTDOOR LIGHTING
10/02/2008 BUILDING - FINAL AQUIROZ Approved IVRS - Inspection :*
CANCELED
01/13/2009 BUILDING - PROGRESS LHANLY Approved
01/13/2009 ELECTRIC - CABLE DROP LHANLY Approved
02/20/2009 OUTDOOR LIGHTING FINAL LHANLY Approved