Permit: T06CM04954
Permit Details
Apply Date:
09/08/2006
Applicant:
N/A
Description:
NEW SCHOOL - CLASSROOM BLDG #4
Architects:
- ORCUTT, HERMAN LAWRENCE
Contractors:
- DIVERSIFIED DESIGN AND CONSTRUCT
Permit Reviews
Permit Number - T06CM04954
Permit Status: C of o
Permit Description: NEW SCHOOL - CLASSROOM BLDG #4
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/12/2008 | POST 3RD PARTY REVIEW | 02/19/2008 | COMPLETED |
02/29/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 02/29/2008 | COMPLETED |
03/27/2007 | RESUBMITTAL | 05/23/2007 | COMPLETED |
05/23/2007 | RESUBMITTAL | 06/11/2007 | COMPLETED |
06/09/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 06/10/2008 | COMPLETED |
06/10/2008 | RESUBMITTAL | 06/10/2008 | COMPLETED |
07/09/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 07/09/2008 | COMPLETED |
08/20/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 08/20/2007 | COMPLETED |
09/08/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 09/27/2006 | COMPLETED |
09/10/2007 | POST 3RD PARTY REVIEW | 09/28/2007 | COMPLETED |
09/27/2006 | 3RD PARTY REVIEW-COMMERCIAL | 03/26/2007 | COMPLETED |
10/24/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 10/24/2007 | COMPLETED |
11/19/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 11/19/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM04954
Permit Status: C of o
Permit Description: NEW SCHOOL - CLASSROOM BLDG #4
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/08/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM04954
Permit Description: NEW SCHOOL - CLASSROOM BLDG #4
Total Completed Inspections - 45
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* REINFORCEMENT STEEL @ TOE DOWNS (3) MID-SLAB @ GRID 3.5/H.3 TO G - 4.1/H.3 TO G & 6.0/H.3 TO G |
10/25/2007 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* OK POLE BASES |
11/06/2007 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* - PER REDLINE ON SITE PAGE P104B 4" FROM ROOM 414 & 416 THRU TO 2 WAY CLEANOUT & BACKWATER VALVE WATER TEST OK - PER REDLINE ON SITE 4" FROM ROOM 424 THRU RESTROOMS AND 2 WAY CLEANOUT & BACKWATER VALVE WATER TEST OK - PROVIDE DOCUMENTATION FOR DELETING SECTION OF TRUNK BUILDING DRAIN |
11/16/2007 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* |
11/28/2007 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* PIPE WRAPS, FLOOR DRAINS AND TRAP PRIMERS OK |
11/29/2007 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* KITCHEN ONLY - OK TO POUR |
12/18/2007 | REINFORCED MASONRY PRE-GROUT | GDABBS | Approved | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID 6.1/F1.5 TO F2.5 - H.4/3.4 TO 6.1 - 6.5/G.1 TO H.4 - H.4/3.2 TO 3.3 FROM 8' TO 12' 6.2/F1.5 TO G - 3.4/J.5 TO K FROM 12' TO 15'4" - 3.2/F.2 TO G FROM 8' TO 10' - 6.1/F1.5 TO F2 FROM 8' TO 13'4" - 3.2/H.2 TO H.4 AND h.4/3.4 to 6.1 FROM 16' TO 18' 3.2/H TO H.4 - H.4/3.3 TO 3.5 FROM 14' TO 18' AND 3.4/H.4 TO I |
12/27/2007 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* 1) OK BRANCH CIRCUIT U.G. |
02/27/2008 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* FROM METER THRU RPB TO BUILDING OK |
03/06/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | THIS CLEARANCE HAS BEEN SENT TO TEP UNDER ACTIVITY #T06CM04951 |
04/17/2008 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
05/14/2008 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* |
06/09/2008 | BUILDING ABOVE CEILING | GDABBS | Approved | IVRS - Inspection :* |
06/09/2008 | PLUMBING - GAS PRESS TEST FNL | RRICH | Approved | IVRS - Inspection :* |
06/18/2008 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* CHECKED GREASE DUCT ACCESS DOOR OK TO COMPLETE CEILING CHECKED WATER HEATER VENTING LEFT GAS CARD |
06/24/2008 | PLUMBING - PROGRESS | RRICH | Approved | IVRS - Inspection :* |
06/24/2008 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* |
06/24/2008 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
06/24/2008 | FIRE - ALARM FINAL | LTHOMAS | Approved | |
06/24/2008 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
06/24/2008 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
06/24/2008 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
07/01/2008 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* |
07/01/2008 | MECHANICAL - PROGRESS | JMILITEL | Approved | |
07/01/2008 | MECHANICAL - HOODS | JMILITEL | Approved | |
07/01/2008 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | |
07/02/2008 | OUTDOOR LIGHTING FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
07/02/2008 | ELECTRIC - CABLE DROP | RJIROUDE | Approved | IVRS - Inspection :* |
07/02/2008 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
07/02/2008 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* |
07/02/2008 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
07/02/2008 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
07/03/2008 | FIRE - KITCHEN EXH HOOD FINAL | LLAKEY | Approved | |
07/07/2008 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
07/07/2008 | FIRE - FINAL | LTHOMAS | Approved | |
07/17/2008 | U VALUE FOR WINDOW | GDABBS | Approved | IVRS - Inspection :* |
07/17/2008 | STUCCO MESH | GDABBS | Approved | IVRS - Inspection :* |
07/17/2008 | SIGN - FINAL | JSONKIN | Approved | |
07/18/2008 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
08/26/2008 | ELECTRIC - UFER | RJIROUDE | Approved | |
08/26/2008 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
08/27/2008 | ENGINEERING - FINAL | JBRUCKME | Approved | DENIED SEE ITEMS LISTED FOR 7/10/08 INSPECTION RE-FEE FOR INSPECTION COMPLETE ALL PUNCH LIST ITEMS 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T07BU00763 IS COMPLETED AND APPROVED. SEE BELOW THIS IS NOT TO BE CONSIDERED A FINAL PUNCH LIST DUE TO THE IN-COMPLETE STATUS OF THE SITE WORK AND NON-APPROVED REVISIONS TO THE GRADING PLAN. 1. PROVIDE A REVISED AND C.O.T. APPROVED GRADING PLAN THAT SHOWS ALL REVISIONS. 2. PROVIDE A LETTER OF CERTIFICATION FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT CERTIFYS THAT THE PROJECT, DRAINAGEWAYS, AND THE RETENTION/DETENTION BASIN ARE ALL CONSTRUCTED TO THE C.O.T. APPROVED PLANS. 3. COMPLETE ALL SITE WORK AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 4. PROVIDE BARRICADING TO EXCLUDE PUBLIC ACCESS FROM ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING. 8. PROVIDE SIDEWALK SCUPPERS TO ROUTE 10 YEAR RAINFAL EVENT RUNOFF BELOW ALL SIDEWALK SURFACES. SLOPED SIDEWALKS IN THE COMMON AREA BETWEEN THE BUILDINGS WILL REQUIRE REMOVAL AND REPLACEMENT WITH THE ADDITION OF APPRORIATELY SIZED SIDEWALK SCUPPERS AT THE DRAINAGE SWALE. 10. CORRECT DRAINAGE SWALE DISCHARGES INTO THE PLAY AREA AND SIDEWALK FILTER FABRIC IS REQUIRED UNDER HAND PLACED ROCK RIP RAP. 11. VERIFY THAT ROCK RIP RAP AT THE RETENTION/DETENTION BASIN IS SUFFICIENT TO PREVENT EROSION OF THE BASIN OUTLET. 12. PROVIDE ROCK RIP RAP ON FILTER FABRIC AT ROOF DRAIN DOWNSPOUTS AND DRAINAGE SWALES TO PREVENT EROSION OF LANDSCAPE AREAS AND SLOPES. 13. PROVIDE 3' CURB TERMINAL SECTIONS PER S.D. 213 AT ENTRANCES FROM BILBY RD. 15. CONSTRUCT DRAINAGE SWALE NORTH OF THE BALLFIELD. 17. CONSTRUCT VERTICAL CURB AT ROADWAY SOUTHEAST OF BASKETBALL COURT. 18. CORRECT PONDING WATER IN BUBBLE-UP BOX NEAR SOUTHWEST CORNER OF SCHOOL BLDG. |
08/27/2008 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
09/25/2008 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* REVISION 13 |
06/09/2009 | PERMIT FINALED | LJACKSON | Approved |