Permit: T06CM04954

Parcel: 14101008C


Addresses:

10750 E BILBY RD 04


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T06CM04954

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
07/02/2008 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
03/05/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ SOUTH OUTDOOR CONCRETE RAISED PLATFORM W/TWO ATTACHED RAMPS AND 1 SET OF STAIRS
02/29/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/17/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ TOE DOWNS (3) MID-SLAB @ GRID 3.5/H.3 TO G - 4.1/H.3 TO G & 6.0/H.3 TO G
10/04/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) BLDG #C-2 MASONRY REINFORCEMENT AT GRID K/3.4 TO 6.1 6.1/H.4 TO K TO 18 FOOT AFF
2) REINFORCEMENT STEEL AT FOOTINGS AT GRID 6.1/E TO G & F/4.1 TO 4.2
10/03/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING STEEL REINFORCMENT @ GRID LINES H.4/6.5 TO 7.1
7/G TO H.4 - G/7 TO 8 - 8/F.2 TO 6 - F.2/7 TO 8 & F.1/6.5 TO 7
09/13/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 - F6 COLUMN FOOTINGS @ 6.4/G - H.1 - H.2 & H.4
2 - F6 COLUMN FOOTINGS @ G/4.1 & G/6.1

BLDG #C - 2 @ GRID LINES F/3.1 TO 4.1 - G/4.1 TO 6.4
6.4/G TO H.6 - H.6/6.4 TO 6.1 - 4.1/F TO G
09/12/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
07/19/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
F6 COLUMN FOOTINGS @ G/3.4 & 4.5 AND @ H.1/3.4, 5 & 5.5
07/18/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BLDG. C-2 FOOTINGS
H2.5/3.2 TO 3.3
3.2/H2.5 TO H.1
3.3/H.1 TO I
H.1/3.3 TO 6
6/H.1 TO K
K/6 TO 3.4
3.4/K TO I
I/3.4 TO 3.3
3.5/H.1 COLUMN FOOTING
07/17/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINOUS FOOTINGS AND COLUMN FOOTINGS REINFORCEMENT STEEL
1. (2) F-4 COLUMN FOOTINGS @ G/3.2 & G.2/3.2
2. CONTINUOUS FOOTINGS #WF-1
F/3.2 TO 3.1
3.1/F TO G
3.2/F.6 TO F.7
F.6/3.1 TO 3.2
G.1/3.2 TO 2.2
2.2/H TO I
2.1/G2.5 TO G5.5
G.5.5/2.2 TO 2.1
07/16/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
-- BUILDING COLUMN FOOTINGS AT INTERIOR OF BLDG. #C-2
-- (2) F-3 COLUMN FOOTINGS MID-SPAN OF BLDG.