Apply Date:
09/01/2006
Applicant:
N/A
Description:
NEW CHURCH
Architects:
- SZADKOWSKI, MIREK EDWARD
Contractors:
- WARRIOR CONSTRUCTION L L C
Permit Reviews
Permit Number - T06CM04879
Permit Status: C of o
Permit Description: NEW CHURCH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2007 | RESUBMITTAL - SITE | 04/02/2007 | COMPLETED |
| 03/02/2007 | POST 3RD PARTY REVIEW | 04/05/2007 | COMPLETED |
| 04/05/2007 | RESUBMITTAL | 01/07/2008 | COMPLETED |
| 08/28/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 09/03/2008 | COMPLETED |
| 09/01/2006 | PLANS OK TO SUBMIT - SITE | 09/01/2006 | COMPLETED |
| 09/01/2006 | SITE | 10/16/2006 | COMPLETED |
| 09/07/2006 | OTHER | 09/07/2006 | COMPLETED |
| 11/17/2006 | RESUBMITTAL - SITE ALL | 01/31/2007 | COMPLETED |
| 12/19/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 12/19/2006 | COMPLETED |
| 12/19/2006 | 3RD PARTY REVIEW-COMMERCIAL | 03/02/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM04879
Permit Status: C of o
Permit Description: NEW CHURCH
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/01/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM04879
Permit Description: NEW CHURCH
Total Completed Inspections - 42
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2008 | ELECTRIC - UFER | RJIROUDE | Approved | IVRS - Inspection :* 3/0 COPPER ATTACHED TO REBAR IN FOOTING MORE THAN 20' |
| 03/18/2008 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* WATER TEST THRU BLD. THRU 2-WAY CLEANOUT TO TAP AT STREET OK |
| 03/18/2008 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* |
| 03/28/2008 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
| 08/28/2008 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | PER SPECIAL INSPECTION REPORTS PROVIDED BY WTI |
| 08/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | |
| 09/02/2008 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection :* |
| 09/09/2008 | U VALUE FOR WINDOW | GDABBS | Approved | IVRS - Inspection :* LOW CASEMENT WINDOWS LESS THAN 18" OFF FLOOR MUST BE TEMPERED |
| 09/11/2008 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* 1. YOU HAVE AN APPROVED SITE PLAN. NOW YOU NEED AN APPROVED SITE UTILITY PLAN. 2. OK TO COVER ALL AREAS INSIDE 3. YARDWATER OK TO COVER YARD |
| 09/11/2008 | FRAMING | GDABBS | Approved | IVRS - Inspection :* ALL EXCEPT UNDERSIDE OF ENTRY CANOPY |
| 09/11/2008 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* 1) SERVICE INSPECTION 2) RECEIVED LETTER OF TORQUE |
| 09/11/2008 | ELECTRIC - CABLE DROP | RJIROUDE | Approved | IVRS - Inspection :* |
| 09/11/2008 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* |
| 09/12/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER R. JIROUDEK |
| 09/22/2008 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* PROVIDE ACCESS PANELS TO DUCT SMOKE DETECTORS |
| 10/02/2008 | STUCCO MESH | GDABBS | Approved | IVRS - Inspection :* LATHE @ CEILING OF EXTERIOR ENTRY CANOPY |
| 10/08/2008 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* PROVIDE MORE SUPPORTS ON FLEX DUCTS TO REMOVE KINKS AT DIFFUSERS. WILL CHECK ON FINAL. OK FOR CEILING TILES. |
| 10/10/2008 | PLUMBING - ABOVE CEILING | BBENEDON | Approved | IVRS - Inspection :* |
| 10/13/2008 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* |
| 10/13/2008 | PLUMBING - BACK WATER VALVE | RRICH | Approved | IVRS - Inspection :* |
| 10/16/2008 | BUILDING ABOVE CEILING | GDABBS | Approved | IVRS - Inspection :* |
| 10/21/2008 | FIRE - FINAL | LTHOMAS | Approved | |
| 10/21/2008 | FIRE - ALARM FINAL | LTHOMAS | Approved | |
| 10/21/2008 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 10/21/2008 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 10/21/2008 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 10/21/2008 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 10/24/2008 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
| 10/24/2008 | OUTDOOR LIGHTING FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
| 10/24/2008 | ELECTRIC - OUTDOOR LIGHTING | RJIROUDE | Approved | IVRS - Inspection :* |
| 10/24/2008 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* |
| 10/28/2008 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* OK FOR FINAL TESTED DUCT SMOKE DETECTORS AIR BALANCE OK |
| 10/29/2008 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
| 10/29/2008 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* RECEIVED BACTERIA REPORT FOR POTABLE WATER RECEIVED LANDSCAPING BACKFLOW CERTIFICATION |
| 10/29/2008 | SHEET ROCK NAILING | GDABBS | Approved | IVRS - Inspection :* |
| 10/29/2008 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
| 10/29/2008 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* |
| 10/29/2008 | NPPO - FINAL | ACONNOR | Approved | |
| 10/29/2008 | ENGINEERING - FINAL | NKALAHAR | Approved | VERIFIED SLOPE ON H/C PARKING SPACES AND ACCESSIBLE ROUTE-ALL ARE WITHIN TOLERANCE OF 2% OR 5% FOR FINAL GRADING: -BASIN CERTIFICATION FROM EOR -ALL LANDSCAPING WORK COMPLETE -ALL SPLASHBLOCKS/RIP RAP AT DOWNSPOUT LOCATIONS -COMPLETE ALL CLEAN UP |
| 10/29/2008 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 10/30/2008 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
| 11/10/2008 | LANDSCAPE - FINAL | ACONNOR | Approved |