Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2008 | ENGINEERING - FINAL | Approved | VERIFIED SLOPE ON H/C PARKING SPACES AND ACCESSIBLE ROUTE-ALL ARE WITHIN TOLERANCE OF 2% OR 5% FOR FINAL GRADING: -BASIN CERTIFICATION FROM EOR -ALL LANDSCAPING WORK COMPLETE -ALL SPLASHBLOCKS/RIP RAP AT DOWNSPOUT LOCATIONS -COMPLETE ALL CLEAN UP |