Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
994 S HARRISON RD
Apply Date:
05/23/2006
Applicant:
STICKLEY DESIGN GROUP
Description:
NEW: 2 STORY OFFICE BLDG
Contractors:
  • HAZEN LTD , STEVE

Permit Reviews

Permit Number - T06CM03066
Permit Status: C of o
Permit Description: NEW: 2 STORY OFFICE BLDG
Start Date Submittal Complete Date Status  
05/23/2006 PLANS OK TO SUBMIT - 3RD PARTY 05/23/2006 COMPLETED Review Details
05/23/2006 PLANS OK TO SUBMIT - SITE 06/29/2006 COMPLETED Review Details
05/24/2006 3RD PARTY REVIEW-COMMERCIAL 07/18/2006 COMPLETED Review Details
05/25/2007 3RD PARTY REVIEW-REVISION/OTHER 05/31/2007 COMPLETED Review Details
05/31/2007 3RD PARTY REVIEW-REVISION/OTHER 01/30/2008 COMPLETED Review Details
06/29/2006 SITE 07/26/2006 COMPLETED Review Details
07/18/2006 POST 3RD PARTY REVIEW 08/02/2006 COMPLETED Review Details
07/26/2006 RESUBMITTAL - SITE 08/18/2006 COMPLETED Review Details
08/02/2006 RESUBMITTAL 08/18/2006 COMPLETED Review Details
09/28/2006 3RD PARTY REVIEW-REVISION/OTHER 10/16/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM03066
Permit Status: C of o
Permit Description: NEW: 2 STORY OFFICE BLDG
Total Outstanding Activity Conditions - 1
Date Name
05/23/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T06CM03066
Permit Description: NEW: 2 STORY OFFICE BLDG
Total Completed Inspections - 43
Date Description Inspector Results Comments
08/31/2006 ELECTRIC - UFER RMAJUTA Approved 3/0 COPPER TO REBAR
09/22/2006 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
WATER TEST UNDERGROUND THRU BUILDING TO 3' OF EXTERIOR OK
09/29/2006 PLUMBING - PRE SLAB RRICH Approved IVRS - Inspection :*
10/02/2006 ELECTRIC - INTERMEDIATE RMAJUTA Approved IVRS - Inspection :*
7 - 2 1/2" PVC CENTER OF BLDG. TO O/S SOUTH WALL
1 - 2" PVC CENTER OF BLDG. TO O/S SOUTH WALL
OK TO COVER

JOANN -- CAN WE CLEAR TEMP ON THIS CALL
10/03/2006 ELECTRIC - TEMPORARY SERVICE RSUBA Approved IVRS - Inspection :*
10/04/2006 TEP CLEARANCE - AM JWEATHER Approved TMPP CLEARED PER R. SUBA
10/12/2006 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
WATER TEST THRU BUILDING TO EXISTING 4" SEWER OK
10/12/2006 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
2" PVC SCH 40 FROM RPBA & METER PER REDLINE ON SITE, WATER TEST, SHALL HAVE REVISED APPROVED SITE PLAN FOR WATER BECAUSE OF INCREASE TO TOTAL DEVELOPED LENGTH. COVER AT OWN RISK.
11/07/2006 EXCAVATION/LAYOUT REBAR & ZON GDABBS Approved IVRS - Inspection :*
TWO SOUTHERNMOST CANOPY COLUMN PEDESTALS AS PER DETAIL 3 ON SHEET S-6
11/08/2006 BUILDING PRE-SLAB GDABBS Approved IVRS - Inspection :*
1) ELEVATOR PIT FLOOR REINFORCED STEEL MAT
12/06/2006 EXT METAL CLIPS/EXT SHEATHING GDABBS Approved IVRS - Inspection :*
H-3 & A-35 CLIPS AT SECOND FLOOR LEDGERS
TO BE HIDDEN BY SHEAR PANELS
01/08/2007 ROOF NAILING GDABBS Approved IVRS - Inspection :*
03/23/2007 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
WATER TEST WASTE & VENT THRU ROOF OK
WATER PIPING OK
04/25/2007 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
PLANS & ENERGY CODE REQUIRE MIN. R5 DUCT LINER.
1" LINER IS R4.2

SUPPLY & EXHAUST IN 2ND FLOOR HARD LID AREAS OK TO SHEETROCK. CONDENSATE IN WALL 2ND FLOOR OK TO COVER
PLEASE ADD MECH. ABOVE CEILING TO PERMIT CARD.
04/30/2007 STUCCO MESH GDABBS Approved IVRS - Inspection :*
05/23/2007 FRAMING GDABBS Approved IVRS - Inspection :*
SECOND FLOOR
OK TO COVER
06/01/2007 ELECTRIC - CONSTRUCTION POWER RJIROUDE Approved IVRS - Inspection :*
06/04/2007 ELECTRIC - TEMP POWER FOR TEST RJIROUDE Approved IVRS - Inspection :*
06/04/2007 ELECTRIC - CABLE DROP RJIROUDE Approved IVRS - Inspection :*
06/05/2007 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
BALANCE OF SECOND FLOOR OK TO FINISH
07/13/2007 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
07/17/2007 BUILDING ABOVE CEILING GDABBS Approved IVRS - Inspection :*
2ND FLOOR OK
07/18/2007 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
OK FOR CEILING 2ND FLOOR
WILL CHECK RELOCATED FAN COIL 1ST FLOOR ON FINAL
07/30/2007 PLUMBING - GAS PRESSURE TEST RRICH Approved GAS CARD LEFT WITH GENERAL CONTRACTOR
07/31/2007 PLUMBING - GAS PRESS TEST FNL RRICH Approved GAS CARD LEFT WITH GENERAL CONTRACTOR
08/06/2007 U VALUE FOR WINDOW LHANLY Approved IVRS - Inspection :*
08/24/2007 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
08/24/2007 NPPO - FINAL ACONNOR Approved
08/24/2007 LANDSCAPE - FINAL ACONNOR Approved
08/24/2007 RIGHT OF WAY - FINAL SDAMRON Approved PER EMAIL
08/27/2007 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
08/27/2007 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
08/27/2007 FIRE SPKLR - FINAL LTHOMAS Approved
08/27/2007 FIRE - FINAL LTHOMAS Approved
08/30/2007 ELECTRIC - FINAL RJIROUDE Approved IVRS - Inspection :*
RECEIVED LETTERS FOR USE OF ALUMINUM FEEDERS
OK FINAL
08/30/2007 OUTDOOR LIGHTING FINAL RJIROUDE Approved IVRS - Inspection :*
08/30/2007 ELECTRIC - UNDERGROUND RJIROUDE Approved IVRS - Inspection :*
08/30/2007 ELECTRIC - ABOVE CEILING RJIROUDE Approved IVRS - Inspection :*
08/31/2007 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
11/21/2007 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
APPEAL FOR NON-ACCESSIBILITY OF SHOWER
APPROVED BY JESSE SANDERS & THE DIRECTOR
11/21/2007 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
APPROVED VIA PETITION OF APPEAL FROM BLD OFFICIAL
11/29/2007 ENGINEERING - FINAL NKALAHAR Approved APPROVED WITH GRADING PERMIT T06BU00469
12/06/2007 PERMIT FINALED LJACKSON Approved