Permit: T05CM05786
Permit Details
Status:
C of o
Type:
COMMERCIAL ALTERATION
Address:
1010 N ALVERNON WY
Address NEW:
1010 N ALVERNON WY
Apply Date:
11/17/2005
Applicant:
JIM WATSON
Description:
TI:CHURCH
Contractors:
- BARKER MORRISSEY CONTRACTING INC
Permit Reviews
Permit Number - T05CM05786
Permit Status: C of o
Permit Description: TI:CHURCH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2006 | RESUBMITTAL - SITE ALL | 06/26/2006 | COMPLETED |
| 02/13/2007 | REVISION - - 2ND | 02/14/2007 | COMPLETED |
| 06/26/2006 | RESUBMITTAL - SITE ALL | 08/22/2006 | COMPLETED |
| 06/26/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 06/26/2006 | COMPLETED |
| 06/26/2006 | 3RD PARTY REVIEW-COMMERCIAL TI | 07/13/2006 | COMPLETED |
| 07/13/2006 | POST 3RD PARTY REVIEW | 08/29/2006 | COMPLETED |
| 11/06/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 11/09/2006 | COMPLETED |
| 11/09/2006 | REVISION - - 1ST | 11/09/2006 | COMPLETED |
| 11/17/2005 | PLANS OK TO SUBMIT - SITE | 11/17/2005 | COMPLETED |
| 11/17/2005 | SITE | 12/19/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM05786
Permit Status: C of o
Permit Description: TI:CHURCH
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/17/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM05786
Permit Description: TI:CHURCH
Total Completed Inspections - 28
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2006 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 10/17/2006 | ELECTRIC - INTERMEDIATE | CCLEMENS | Approved | IVRS - Inspection :* OK WALL COVER EAST AREAS NOTE: EMERGENCY LIGHTING TO BE FED FROM LIGHTING IN AREA -- 700.12 PROVIDE BACK SUPPORT FOR RECEPTACLE BOXES SO THEY WON'T ROLL INTO WALL. |
| 10/17/2006 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
| 10/25/2006 | SHEET ROCK NAILING | AALEGRIA | Approved | IVRS - Inspection :* PROVIDE FIRE-SEALANT ON ALL PENETRATIONS ON FIRE WALL A-3/B CLASSIFICATION |
| 11/13/2006 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* YOU CANNOT HAVE COMBUSTIBLE MATERIAL IN A RETURN AIR PLENUM. ALL WOOD ABOVE RESTROOMS MUST BE COVERED. CHECKED CONDENSATE DRAIN LINES - OK TO INSULATE. RECALL FOR INSPECTION. |
| 11/14/2006 | PLUMBING - GAS PRESSURE TEST | JMILITEL | Approved | IVRS - Inspection :* 7 PSI TEST IS OK PROVIDE ACCESS TO ROOF. CANNOT LEAVE CLEARANCE UNTIL EQUIPMENT ON ROOF HAS BEEN CHECKED. |
| 11/14/2006 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* OK TO SET TILES THROUGHOUT |
| 11/20/2006 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* 1. RELOCATED FIXTURES TO BE EFFECTIVELY ATTACHED TO GRID. 2. INSTALL FLEX FOR 2-CORD CONNECTED FIXTURES. 3. FINISH #1 & #2 OF PREVIOUS INSPECTION. OK TO TILE EXCEPT AS NOTED. |
| 11/28/2006 | MECHANICAL - FINAL | LHANLY | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1. COMBUSTIBLE MATERIAL IN RETURN AIR PLENUM REFERENCE NOTES DATED 11/13/06 INSPECTION STOPPED |
| 12/06/2006 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* COMBUSTIBLES HAVE BEEN COVERED WITH SCRIM ON FINAL HAVE A LADDER SETUP TO ACCESS THE ROOF. PROVIDE AIR BALANCE REPORT AS PER PLANS. |
| 12/12/2006 | FIRE - FINAL | LTHOMAS | Approved | |
| 12/12/2006 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 12/12/2006 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 12/12/2006 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | TEMP ONLY (due to clear-up needed & to finish work.) PER EMAIL |
| 12/13/2006 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* 1. PROVIDE GAS PRESS. TEST FOR FINAL GAS PRESSURE TEST 2. HAVE CONTRACTOR ON SITE FOR INSPECTION |
| 12/13/2006 | PLUMBING - GAS PRESS TEST FNL | RLEDONNE | Approved | IVRS - Inspection :* |
| 12/13/2006 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* |
| 01/30/2007 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* ENSURE THE INSTALLATION OF 1" SIGNAGE ON DOOR JAMBS @ MARKED EXITS -- DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED. |
| 02/16/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 02/16/2007 | ENGINEERING - FINAL | JBRUCKME | Approved | |
| 02/16/2007 | OUTDOOR LIGHTING FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/16/2007 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/16/2007 | ELECTRIC - OUTDOOR LIGHTING | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/16/2007 | ELECTRIC - PROGRESS | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/16/2007 | ELECTRIC - TEMP POWER FOR TEST | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/16/2007 | ELECTRIC - CONSTRUCTION POWER | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/16/2007 | ELECTRIC - TEMPORARY SERVICE | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/20/2007 | PERMIT FINALED | BFLORES | Approved |