Permit: T05CM01648
Permit Details
Status:
C of o
Type:
COMMERCIAL NEW
Address:
3030 W EL CAMINO DEL CERRO
Address NEW:
3030 W EL CAMINO DEL CERRO
Apply Date:
04/14/2005
Applicant:
DAVID KINCAID
Description:
JACK IN BOX:NEW
Contractors:
- PREMIER CONSTRUCTION CORPORATION
- PREMIER RECONSTRUCTION SPECIALIST INC (FN)
Permit Reviews
Permit Number - T05CM01648
Permit Status: C of o
Permit Description: JACK IN BOX:NEW
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 02/22/2006 | COMPLETED |
| 04/14/2005 | PLANS OK TO SUBMIT - RES 3RD PARTY | 04/20/2005 | COMPLETED |
| 04/20/2005 | 3RD PARTY REVIEW-COMMERCIAL | 06/15/2005 | COMPLETED |
| 06/09/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 06/09/2006 | COMPLETED |
| 06/15/2005 | POST 3RD PARTY REVIEW | 07/01/2005 | COMPLETED |
| 08/23/2005 | RESUBMITTAL | 08/23/2005 | COMPLETED |
| 12/13/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 12/16/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM01648
Permit Status: C of o
Permit Description: JACK IN BOX:NEW
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/14/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM01648
Permit Description: JACK IN BOX:NEW
Total Completed Inspections - 43
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2005 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection :* EXCLUDES CANOPY AREA AND SITE WALLS |
| 11/10/2005 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* |
| 11/14/2005 | ELECTRIC - CONSTRUCTION POWER | CCLEMENS | Approved | IVRS - Inspection :* |
| 11/14/2005 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :*FLOOR SINKS IN MONO POUR INSTALLED OK ALL INTERIOR SINKS AND DRAINS ARE BLOCKED OUT. WATER SERVICE UNDER SLAB OK ROOF DRAINS UNDER SLAB OK- SUBJECT TO TEST AT A LATER DATE. OK FOR CONCRETE. NEED TO SEE INTERCEPTOR |
| 11/15/2005 | TEP CLEARANCE - AM | JKOZUCH | Approved | TEMP CONST POWER |
| 12/01/2005 | FUEL PIPING INSP. & PRESS TEST | RDRAVES | Approved | |
| 12/09/2005 | ELECTRIC - UNDERGROUND | CCLEMENS | Approved | IVRS - Inspection :* OK TO COVER REMAINDER - ELECTRICAL FUELING CONDUIT IN DITCH, BUILDING TO CANOPY |
| 12/19/2005 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* 1) EXCLUDES PARAPETS AND TOWER ROOF |
| 12/21/2005 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* 1. DISCUSSED YARDWATER REQUIREMENTS W/SC |
| 12/28/2005 | SITE - SEWER | RMYERS | Approved | IVRS - Inspection :*SOME OF THE PIPING BETWEEN BLDG AND INTERCEPTOR COVERD W/O INSPECTION. INTERCEPTOR NOT VENTED PER PLAN VENT SIZE MAY NOT BE REDUCED VENT TO BE WITHIN 10' OFF INTERCEPTOR USE DRAINAGE FITTINGS INVERT OF VENT TO BE ABOVE DRAINAGE CENTERLINE |
| 01/17/2006 | PLUMBING - GAS PRESSURE TEST | RMYERS | Approved | IVRS - Inspection :*SPLIT SYSTEM BOTH SYSTEMS PRESSURE TEST OK |
| 01/17/2006 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* |
| 01/17/2006 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
| 01/24/2006 | STUCCO MESH | AQUIROZ | Approved | IVRS - Inspection :* |
| 01/26/2006 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* |
| 04/06/2006 | MECHANICAL - PROGRESS | JMILITEL | Approved | IVRS - Inspection :* FIRE WRAP NOT INSTALLED PER MANUFACTURERS SPECS. PLEASE PROVIDE INSTALL INSTRUCTIONS. EXTEND FIRE WRAP TO THE OUTLET TERMINAL. PROVIDE 1" CLEARANCE FROM INSULATION & COMBUSTIBLES AROUND WATER HEATER VENTS 1-60 DEGREE OFFSET ALLOWED. HORIZONTAL SECTION CANNOT EXCEED 75% OF TOTAL HEIGHT. DUCT SMOKE DETECTOR SENSING TUBES MUST COVER 85% OF PLENUM & BE AHEAD OF ALL DUCT CONNECTIONS. |
| 04/07/2006 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* 1. ABS DWV MAY NOT BE INSTALLED IN EXTERIOR EXPOSED LOCATION. 2. ANSUL VALVE ABOVE T-BAR MAY NOT USE UNION. |
| 04/07/2006 | PLUMBING - GAS PRESS TEST FNL | RMYERS | Approved | IVRS - Inspection :* |
| 05/08/2006 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection :* |
| 05/10/2006 | ELECTRIC - INTERMEDIATE | RMAJUTA | Approved | IVRS - Inspection :* 1. GAS BOND & WATER BOND IN CEILING OK 2. J-BOX MISSING COVER ABOVE FRYERS - LEAVE OPEN OK TO COVER LEAVE OPEN FOR NEXT INSPECTION. |
| 05/10/2006 | BUILDING ABOVE CEILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 05/10/2006 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
| 05/14/2006 | ELECTRIC - TEMPORARY SERVICE | RHOLLAND | Approved | IVRS - Inspection :* OK TEMP POWER FOR TEST |
| 05/30/2006 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* |
| 05/30/2006 | MECHANICAL - HOODS | CWILLIAM | Approved | IVRS - Inspection :* |
| 05/30/2006 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
| 06/02/2006 | ELECTRIC - FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
| 06/06/2006 | FUEL TANK FINAL 791-4502 | LLAKEY | Approved | |
| 06/06/2006 | FIRE - FINAL | LLAKEY | Approved | |
| 06/06/2006 | FIRE - KITCHEN EXH HOOD FINAL | LLAKEY | Approved | |
| 06/08/2006 | ELECTRIC - OUTDOOR LIGHTING | CCLEMENS | Approved | IVRS - Inspection :* |
| 06/08/2006 | ELECTRIC - PROGRESS | CCLEMENS | Approved | IVRS - Inspection :* |
| 06/08/2006 | OUTDOOR LIGHTING FINAL | CCLEMENS | Approved | IVRS - Inspection :* |
| 06/09/2006 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL (NOTE: NO NEW WORK IN R.O.W.) |
| 06/09/2006 | BUILDING - PROGRESS | AQUIROZ | Approved | IVRS - Inspection :* |
| 06/09/2006 | U VALUE FOR WINDOW | AQUIROZ | Approved | IVRS - Inspection :* |
| 06/21/2006 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* 1. ALL CORRECTIONS MADE OK PLUMBING FINAL OK OK FOR C OF O PENDING ANY OTHER INSPECTIONS. |
| 10/27/2006 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* PARTIAL FOR TEMP C OF O WILL RECALL FOR BUILDING FINAL & FINAL C OF O |
| 10/27/2006 | ENGINEERING - FINAL | JFEMLING | Approved | The following items must be complete prior to final C of O. 1) Provide engineering cert. that basins and drainage ways have been constructed per the approved plans. 2) Clean all storm M.H. 3) Grout all storm M.H. frame and grate in place. 4) Complete sidewalk to ROW at SE corner of lot as shown on the approved grading plan. 5) Basin #1 is not constructed per plan, construct per plan or submit revision to city of review and approval. 6) Basin 3A not constructed. Construct per plan or submit revision to city of review and approval. 7) Storm M.H. in drive isle between basin 2 and 3B not found. 8) Repair erosion at concrete inlet to basin 2 9) Sidewalk not constructed between building and private drive as shown on approved grading plan. |
| 10/27/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | OK for Temp C of O Complete ROW DG for approval or per ADOT instructions. |
| 10/30/2006 | ELECTRIC - UFER | CCLEMENS | Approved | |
| 11/01/2006 | SIGN - FINAL | JYBARRA | Approved | SIGNS COMPLETE; HOWEVER, ACCOUNT IN ARREARS FROM SEPT; MUST PAY REG FEES BEFORE C/O CAN BE ISSUED |
| 03/05/2007 | PERMIT FINALED | BFLORES | Approved |