Permit: T05BU01319
Permit Details
Status:
Final
Type:
COMMERCIAL OTHER
Address:
3030 W EL CAMINO DEL CERRO
Address NEW:
3030 W EL CAMINO DEL CERRO
Apply Date:
05/26/2005
Applicant:
N/A
Description:
GRADING:
Contractors:
- PREMIER RECONSTRUCTION SPECIALIST INC (FN)
Permit Reviews
Permit Number - T05BU01319
Permit Status: Final
Permit Description: GRADING:
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2007 | REVISION - GRADING | 03/01/2007 | COMPLETED |
| 05/26/2005 | PLANS OK TO SUBMIT - GRADING | 05/26/2005 | COMPLETED |
| 05/26/2005 | GRADING | 06/23/2005 | COMPLETED |
| 07/01/2005 | REVISION - GRADING | 07/20/2005 | COMPLETED |
| 08/11/2005 | RESUBMITTAL - GRADING | 08/18/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU01319
Permit Status: Final
Permit Description: GRADING:
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/26/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05BU01319
Permit Description: GRADING:
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2005 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | 1) ENSURE SEDIMENT CONTROLS ALONG THE NORTH SIDE ARE INSPECTED, MAINTAINED, AND REPAIRED AS NECESSARY. 2) DOCUMENT ALL PERIODIC SITE INSPECTIONS AS PER YOUR SWPPP. 3) SWEEP UP ANY TRACKED MATERIAL FROM PUBLIC ROADWAYS AS NECESSARY. 4) SHOW ANY CHANGES TO YOUR STORM WATER MANAGEMENT PLAN. 5) PROVIDE A CONCRETE/MATERIALS WASH-OUT AREA WHEN PAVING, BLOCK WORK, STUCCO WORK, AND/OR CONCRETE WORK BEGINS. |
| 12/01/2005 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | 1) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT AREA AS PRESCRIBED ON YOUR STORM WATER MANAGEMENT PLAN. 2) ENSURE ROADWAYS ARE SWEPT UP ON A ROUTINE BASIS. 3) ENSURE SPOILS FROM TRENCHING AND DIGGING ACTIVITIES STAY WITHIN YOUR DEFINED GRADING LIMIT. 4) ENSURE SEDIMENT CONTROLS ARE MAINTAINED AS NEEDED AND INSPECTIONS ARE ACCOMPLISHED PER YOUR STORM WATER MANAGEMENT PLAN. |
| 06/01/2006 | LANDSCAPE INSPECTION | ACONNOR | Approved | Complete ROW DG for approval or per ADOT instructions. |
| 11/08/2006 | GRADING - FINAL | MRUSSO | Approved | COMPLETE THE FOLLOWING PRIOR TO APPROVAL: 1) PROVIDE ENGINEER CERT. THAT BASINS AND DRAINAGE WAYS HAVE BEEN COMPLETED PER APPROVED PLANS. 2) GROUT ALL STORM MAN HOLE FRAMES IN PLACE. 3) COMPLETE SIDEWALK TO RIGHT-OF-WAY AT SE CORNER. 4) CLEAN OUT STORM DRAIN LINE BETWEEN BASIN #2 AND #3. 5) PROVIDE LETTER FROM ENGINEER AND AS-BUILT ON CHANGES MADE DURING CONSTRUCTION TO THE APPROVED GRADING PLAN: BASIN #1, BASIN #3A, MAN HOLE IN DRIVE THROUGH. 6) REMOVE WADDLE LOCATED BEHIND TRASH ENCLOSURE ON NORTH SIDE. |
| 11/08/2006 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | |
| 11/08/2006 | STORMWATER FINAL INSPECTION | MRUSSO | Approved |