Inspection Status: Approved
Inspection History: STORMWATER FINAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/08/2006 |
STORMWATER FINAL INSPECTION |
|
Approved |
|
| 10/24/2006 |
STORMWATER FINAL INSPECTION |
|
Not ready for Inspection |
NO ONE HAS CALLED IN INSPECTION WORK STILL BEING DONE AT ENTRANCE. |
| 05/11/2006 |
STORMWATER FINAL INSPECTION |
|
Partial Approval |
STORM WATER WILL BE FINALED DURING THE C OF O INSPECTION, WHEN THIS SITE IS 1005 STABILIZED. SOME SITE WORK IN THE ADOT RIGHT OF WAY WILL REMAIN AND MAY REQUIRE SEDIMENT CONTROLS |