Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2005 | STORMWATER INSTALL OF CONTROLS | Approved | 1) ENSURE SEDIMENT CONTROLS ALONG THE NORTH SIDE ARE INSPECTED, MAINTAINED, AND REPAIRED AS NECESSARY. 2) DOCUMENT ALL PERIODIC SITE INSPECTIONS AS PER YOUR SWPPP. 3) SWEEP UP ANY TRACKED MATERIAL FROM PUBLIC ROADWAYS AS NECESSARY. 4) SHOW ANY CHANGES TO YOUR STORM WATER MANAGEMENT PLAN. 5) PROVIDE A CONCRETE/MATERIALS WASH-OUT AREA WHEN PAVING, BLOCK WORK, STUCCO WORK, AND/OR CONCRETE WORK BEGINS. |
|
| 10/21/2005 | STORMWATER INSTALL OF CONTROLS | Partial Approval | 1) STABILIZED CONSTRUCTION ENTRANCES HAVE BEEN INSTALLED. 2) DISCUSSED SEDIMENT CONTROL LOCATIONS AND INSTALLATION TIME FRAME. 3) CONTROLS WILL BE PLACED ON THE NORTH SIDE OF THE SITE FROM THE WEST END TO THE EAST PROPERTY LINE. 4) CONTROLS WILL BE USED TO PREVENT SOIL/SEDIMENT FROM LEAVING THE SITE AND ENTERING THE EXISTING STORM DRAINAGE WAY. 5) ENSURE ANY CHANGES TO YOUR STORM WATER PLAN ARE SHOWN AND DOCUMENTED. 6) WILL RE-INSPECT WHEN CONTROLS ARE IN PLACE. |