Permit: T05BU01319

Parcel: 10120040D

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
10/24/2006 STORMWATER FOLLOW-UP INSP Approved SITE PAVED NO STORM WATER ISSUES AT THIS TIME
05/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval REVIEWED APPROVED GRADING PLANS, WALKED SITE, DESCRIBED REQUIREMENTS FOR TEMP C OF O.
04/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE, DEVELOPER WAITING FOR ADOT PERMIT
04/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval 1) REMOVE SEDIMENT CONTROLS WHERE SITE HAS BEEN STABILIZED.
2) DISPOSE OF WASTE MATERIALS (CONCRETE, MOTOR, STUCCO, PAINT) PROPERLY.
03/06/2006 STORMWATER FOLLOW-UP INSP Cancelled INSPECTION DONE ON 3/3/06.
03/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval DISCUSSED PARTIAL APPROVAL FOR C OF O AND WHAT WOULD BE REQUIRED FROM ENGINEERING. SEE PREVIOUS INSPECTION FOR DETAILED PUNCH LIST.
02/28/2006 STORMWATER FOLLOW-UP INSP Correction Required CLEAN/REMOVE SPOILS FROM TRENCHING ACTIVITY AT N. PROPERTY BOUNDRY. DIRT FROM SPOILS MUST BE BROUGHT BACK ON TO SITE AND CONTROLS MUST BE RE-ESTABLISHED.

A PERMANENT C OF O FOR ENG. WILL NOT BE GIVEN UNTIL THE SITE WORK IS 100% COMPLETED AND A FINAL GRADING INSPECTION FOR PERMIT # T05BU01319 IS COMPLETED AND APPROVED.

PARTIAL APPROVAL FOR A TEMP C OF O CAN BE GIVEN IF YOU PROVIDE THE FOLLOWING:
1) SEPARATE CONST. ACTIVITY FROM OCCUPIED BLDG.
2) PROVIDE UNOBSTRUCTED ACCESS FOR OCCUPANTS.
3) PROVIDE A PLACE FOR TRASH AND GARBAGE SERVICE FOR OCCUPANTS.
4) PROVIDE PARKING FOR OCCUPANTS
5) NO LIFE/SAFETY HAZARDS ARE PRESENT.
6) MAJOR DRAINAGE STRUCTURES ARE INSTALLED.
01/31/2006 STORMWATER FOLLOW-UP INSP Partial Approval DISCUSSED GRADING PLAN AND SITE PLAN PRIOR TO SITE WORK CONSTRUCTION. ADDRESSED CHANGES THAT WERE MADE WITH DRAINAGE. DISCUSSED DETAILS WITH SCUPPERS, CHANNELS THAT LEAD INTO BASINS, AND BLEED PIPE THAT TIES THE BASINS TOGETHER. ALSO AN ISSUE WITH ADOT RIGHT OF WAY WORK AND PERMITS ASSOCIATED WITH THAT.
01/11/2006 STORMWATER FOLLOW-UP INSP Partial Approval 1) UNTIL SITE IS STABILIZED, SEDIMENT CONTROLS MUST REMAIN IN PLACE AND BE MAINTAINED. RE-ESTABLISH A STABILIZED CONSTRUCTION ENTRANCE AND UTILIZE THAT ENTRANCE.
2) ENSURE DISTURBED SOIL IS KEPT ON SITE TO INCLUDE SPOILS FROM TRENCHING, DIRT WORK, AND TRACKING OF SOIL FROM VEHICLE TRAFFIC.
3) CONTINUE TO UTILIZE YOUR ESTABLISH CONCRETE WASH OUT AREA.
4) CONTINUE TO SWEEP UP TRACKED MATERIAL AS NECESSARY.
5) ENSURE SITE SEDIMENT CONTROL MAINT. INSPECTIONS ARE ACCOMPLISHED AND DOCUMENTED PER YOUR SWPPP.
12/01/2005 STORMWATER FOLLOW-UP INSP Partial Approval 1) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT AREA AS PRESCRIBED ON YOUR STORM WATER MANAGEMENT PLAN.
2) ENSURE ROADWAYS ARE SWEPT UP ON A ROUTINE BASIS.
3) ENSURE SPOILS FROM TRENCHING AND DIGGING ACTIVITIES STAY WITHIN YOUR DEFINED GRADING LIMIT.
4) ENSURE SEDIMENT CONTROLS ARE MAINTAINED AS NEEDED AND INSPECTIONS ARE ACCOMPLISHED PER YOUR STORM WATER MANAGEMENT PLAN.