Permit: T04CM05049
Permit Details
Apply Date:
11/17/2004
Applicant:
SWAN WAYNE E
Description:
TI:OFFICE
Architects:
- SWAN WAYNE E
Contractors:
- G AND J DEVELOPMENT INC ,
Permit Reviews
Permit Number - T04CM05049
Permit Status: Final
Permit Description: TI:OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/17/2004 | COMMERCIAL TI | 11/22/2004 | COMPLETED |
| 11/22/2004 | REVISION | 12/06/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM05049
Permit Status: Final
Permit Description: TI:OFFICE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/17/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04CM05049
Permit Description: TI:OFFICE
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2004 | ELECTRIC - INTERMEDIATE | MCAPISTR | Approved | IVRS - Inspection :DENIED-ALL PATIENT CARE ROOMS MUST COMPLY WITH SECTION 517 OF THE NATIONAL ELECTRICAL CODE. THE MC CABLE MUST BE HCF GRADE, WITH APPROVED CONNECTORS TO TERMINATE IN BOXES. ALL OUTLETS- POWER AND LIGHTING MUST BE WIRED WITH HCF MC. CORRECT AND RECALL. |
| 12/21/2004 | ELECTRIC - ABOVE CEILING | MCAPISTR | Approved | IVRS - Inspection :ALL PATIENT CARE ROOMS MUST COMPLY WITH SECTION 517 OF THE NATIONAL ELECTRICAL CODE. THE MC CABLE MUST BE HCF GRADE, WITH APPROVED CONNECTORS TO TERMINATE IN BOXES. ALL OUTLETS-POWER AND LIGHTING MUST BE WIRED WITH HCF MC. CORRECT AND RECALL. The wiring is not complete or does not comply with code.| 245* |
| 12/21/2004 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | IVRS - Inspection :* |
| 12/28/2004 | FRAMING | HLEYVA | Approved | IVRS - Inspection :* |
| 12/29/2004 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :*/OK TO COVER ALL AREAS |
| 12/29/2004 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :*/1)NOT INSTALLED PER PLAN. NO REDLINES ON SITE 2)EXCEPT WYE BRANCH OR END OF THE LINE CLEAN-OUT, CLEAN-OUTS SHALL BE INSTALLED ABOVE THE FLOW LINE OF THE DRAIN 3) ALL OVER HEAD PIPING TO BE INSTALLED TO TABLE 3-19 94UPC AND INSTALLATION STANDARD 4)HOT PIPING INSULATED BEFORE INSPECTION 5)CONTRACTOR TO BED, AND SHADE ABS BELOW GRADE WITH CLEAN-FILL |
| 12/29/2004 | PLUMBING - PROGRESS | RMYERS | Approved | IVRS - Inspection :* |
| 12/29/2004 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* |
| 01/27/2005 | SHEET ROCK NAILING | HLEYVA | Approved | IVRS - Inspection :* APPROVED |
| 02/28/2005 | FIRE - FINAL | LTHOMAS | Approved | |
| 03/14/2005 | ELECTRIC - FINAL | RMAJUTA | Approved | |
| 03/15/2005 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* BACKFLOW PROTECTION ADDED AT IRRIGATION/ PUMP LOCATION. PLUMBING FINAL OK. OK FOR C OF O PENDING ANY OTHER INSPECTION. |
| 03/16/2005 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* OK C OF O |
| 03/23/2005 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* APPROVED |
| 10/12/2005 | PERMIT FINALED | LJACKSON | Approved |