Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2005 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :* 1) SEE 603.0 APPROVAL DEVICES OR ASSAMBLIES. REMOVE ALL STUCCO FROM AROUND BACKFLOW ASSEMBLY. EXPOSE THE UNIONS AND FITTINGS FOR SERVICE, REPAIR, OR REPLACEMENT. 2) CORRECTIONS MADE OK. OK TO COVER ALL AREAS |
| 12/29/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/1)NOT INSTALLED PER PLAN. NO REDLINES ON SITE 2)EXCEPT WYE BRANCH OR END OF THE LINE CLEAN-OUT, CLEAN-OUTS SHALL BE INSTALLED ABOVE THE FLOW LINE OF THE DRAIN 3) ALL OVER HEAD PIPING TO BE INSTALLED TO TABLE 3-19 94UPC AND INSTALLATION STANDARD 4)HOT PIPING INSULATED BEFORE INSPECTION 5)CONTRACTOR TO BED, AND SHADE ABS BELOW GRADE WITH CLEAN-FILL |