Permit: T04CM01767
Permit Details
Apply Date:
04/16/2004
Applicant:
N/A
Description:
NEW:WAREHOUSE/OFFICE
Contractors:
- HAZEN LTD , STEVE
Permit Reviews
Permit Number - T04CM01767
Permit Status: C of o
Permit Description: NEW:WAREHOUSE/OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2004 | PLANS OK TO SUBMIT - COMM | 04/19/2004 | COMPLETED |
| 04/16/2004 | PLANS OK TO SUBMIT - SITE | 05/25/2004 | COMPLETED |
| 04/19/2004 | COMMERCIAL NEW | 05/25/2004 | COMPLETED |
| 06/16/2004 | RESUBMITTAL | 07/19/2004 | COMPLETED |
| 07/19/2004 | RESUBMITTAL | 07/29/2004 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T04CM01767
Permit Description: NEW:WAREHOUSE/OFFICE
Total Completed Inspections - 32
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2004 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | IVRS - Inspection : See detailed listing on site.| 999*/ 1) SOIL WATER TEST IS OK 2) YARD WATER LINE AIR TEST OK FROM METER LOCATION TO BLDG SERVICE 3) BLDG SEWER APPROVED PLANS 0411 FOR BACKWATER VALVE 4) OK TO BACKFILL TRENCH WITHIN STRUCTURE |
| 08/13/2004 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :* |
| 08/16/2004 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection : |
| 08/16/2004 | BUILDING PRE-SLAB | AMATHIES | Approved | IVRS - Inspection :* |
| 08/16/2004 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 09/15/2004 | PLUMBING - YARD WTR LINE/TEST | TRINIVJR | Approved | IVRS - Inspection :*/1)YARD WATER LINE HAS BEEN CONNECTED TO METER. 2)OK TO BACKFILL TRENCH |
| 10/22/2004 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :*/OK WALLS |
| 10/25/2004 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | 1) SOIL WATER TEST IS OK 2) WASTE AND VENT SYSTEM IS OK 3) OVERHEAD WATER DISTRIBUTION IS OK |
| 10/25/2004 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* |
| 11/04/2004 | SHEET ROCK NAILING | AMATHIES | Approved | IVRS - Inspection :* COVER ALL AREAS EXCEPT 1 HR. WALL. |
| 11/05/2004 | ELECTRIC - TEMP POWER FOR TEST | RMAJUTA | Approved | IVRS - Inspection :* APPROVED TO CLEAR |
| 11/08/2004 | TEP CLEARANCE - AM | JKOZUCH | Approved | ECO |
| 11/15/2004 | FRAMING | AMATHIES | Approved | IVRS - Inspection :* |
| 11/26/2004 | PLUMBING - PROGRESS | TRINIVJR | Approved | IVRS - Inspection :*/1)BACKFLOW PREVENTER INSTALLATION IS OK 2)OK TO BACKFILL TRENCH |
| 12/06/2004 | BUILDING ABOVE CEILING | AMATHIES | Approved | IVRS - Inspection :* |
| 12/06/2004 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | IVRS - Inspection :* |
| 12/13/2004 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :*TEMP C OF O OK |
| 12/13/2004 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* |
| 12/14/2004 | ENGINEERING - FINAL | JBRUCKME | Approved | TEMPORARY C OF O APPROVED. 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU01506 IS COMPLETED AND APPROVED. 2. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AND BARRICADE AREAS WHERE CONSTRUCTION ACTIVITY IS OCCURRING TO PROVIDE SAFE ACCESS TO THE BUILDING. WAYNE 240-4545 |
| 12/14/2004 | LANDSCAPE - FINAL | ACONNOR | Approved | Ok for Temp C of O For approval complete landscape per plan. |
| 12/14/2004 | NPPO - FINAL | ACONNOR | Approved | Ok for Temp C of O For approval complete landscape per plan. |
| 12/14/2004 | FIRE - FINAL | LTHOMAS | Approved | |
| 12/14/2004 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 12/14/2004 | PLUMBING - FINAL | TRINIVJR | Approved | IVRS - Inspection :*1) URINAL SHALL HAVE A C. O 2) URINAL DISCHARGE TUBE @ VACUME BREAKER SHALL HAVE A MIN. OF 6" FROM C. L TO TOP OF FIXTURE 3) SHALL PROVIDE A EXAPANSION TANK @ WATER HTR 4) OK FOR TEMP C OF O |
| 12/15/2004 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) INSTALL PERMANENT PANEL SCHEDULES IN BREAKER PANELS 2) INSTALL LABELS ON DOSCONNECTS AT SERVICE OUTSIDE AND PANELS INSIDE 3) SUPPORT CONDUIT WITHIN 3' OF TERMINATIONS ABOVE INSIDE PANELS AND AT DISCONNECTS FOR HEATING UNITS OK FOR TEMP C/O |
| 12/15/2004 | BUILDING - FINAL | AMATHIES | Approved | IVRS - Inspection :* 1) OK FOR TEMP C OF O |
| 12/17/2004 | RIGHT OF WAY - FINAL | RLEIGH | Approved | OK FOR TEMP C /O ONLY |
| 02/11/2005 | PLUMBING - GAS PRESSURE TEST | TRINIVJR | Approved | |
| 02/11/2005 | PLUMBING - BACK WATER VALVE | TRINIVJR | Approved | |
| 02/28/2005 | EXCAVATION/LAYOUT REBAR & ZON | BSTEVENS | Approved | |
| 02/28/2005 | EXT METAL CLIPS/EXT SHEATHING | BSTEVENS | Approved | |
| 03/15/2005 | PERMIT FINALED | DROBEY | Approved |