Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2005 | PLUMBING - SEWER HCS CONNECT | Approved | ||
| 08/13/2004 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) SOIL WATER TEST IS OK 2) YARD WATER LINE AIR TEST OK FROM METER LOCATION TO BLDG SERVICE 3) BLDG SEWER APPROVED PLANS 0411 FOR BACKWATER VALVE 4) OK TO BACKFILL TRENCH WITHIN STRUCTURE |