Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T03CM03799
Permit Details
Apply Date:
07/31/2003
Applicant:
SHAMBACH, DAVID E.
Description:
REMODEL:SFR TO OFFICE
Contractors:
- ROSSETTI R G COMPANY
Permit Reviews
Permit Number - T03CM03799
Permit Status: C of o
Permit Description: REMODEL:SFR TO OFFICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/08/2005 | REVISION - WALK THRU | 07/08/2005 | COMPLETED |
07/31/2003 | PLANS OK TO SUBMIT - COMM | 07/31/2003 | COMPLETED |
07/31/2003 | COMMERCIAL TI | 09/09/2003 | COMPLETED |
09/09/2003 | COMMERCIAL TI | 10/21/2003 | COMPLETED |
10/21/2003 | RESUBMITTAL | 01/02/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM03799
Permit Status: C of o
Permit Description: REMODEL:SFR TO OFFICE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/31/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T03CM03799
Permit Description: REMODEL:SFR TO OFFICE
Total Completed Inspections - 32
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2004 | ELECTRIC - UFER | RMAJUTA | Approved | IVRS - Inspection :*/ #4 COPPER TO REBAR ADDITION APPROVED. |
08/12/2004 | REINFORCED MASONRY PRE-GROUT | AQUIROZ | Approved | IVRS - Inspection :* |
08/12/2004 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* |
07/20/2005 | BUILDING ABOVE CEILING | AQUIROZ | Approved | IVRS - Inspection :* |
12/28/2005 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
06/28/2006 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) OK TO COVER 3) WATER TEST ONE RISER TO TEN FEET OK |
12/01/2006 | ELECTRIC - INTERMEDIATE | RMAJUTA | Approved | IVRS - Inspection :* |
12/20/2006 | STUCCO MESH | AQUIROZ | Approved | IVRS - Inspection :* |
12/20/2006 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
12/21/2006 | PLUMBING - ABOVE CEILING | RMYERS | Approved | IVRS - Inspection :* |
12/27/2006 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection : See detailed listing on site.| 999* INSULATE T-WYES WITH 1 1/2" FOIL WRAP AS PER PLANS DO NOT USE NYLON ZIP TIES FOR HANGER STRAP ON FLEX DUCTS. USE WHAT THE PLANS REQUIRE. |
12/27/2006 | MECHANICAL - INTERMEDIATE | JWEATHER | Approved | CONTRACTOR GENE #603-9874 CALLED AT 12:12 PM ON 12/27/06 TO CANCEL INSPECTION |
12/28/2006 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* CORRECTIONS MADE OK |
01/03/2007 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
01/25/2007 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO TEXTURE & TAPE THROUGHOUT |
04/16/2007 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* OK GROUND RODS |
04/24/2007 | ELECTRIC - CABLE DROP | RMAJUTA | Approved | IVRS - Inspection :* |
04/27/2007 | ELECTRIC - TEMP POWER FOR TEST | RMAJUTA | Approved | IVRS - Inspection :* |
04/30/2007 | TEP CLEARANCE - AM | JWEATHER | Approved | TMPP CLEARED PER R. MAJUTA |
10/04/2007 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* OK TO COVER YARDWATER OK TO COVER SEWER |
10/04/2007 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection :* |
12/13/2007 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection :* |
12/03/2008 | PLUMBING - FINAL | RMYERS | Approved | 1. CLEANOUT IS BURIED AND OR THE SIDEWALK 2. REPAIR HOLE THRU FOUNDATION AT SEWER CONNECTION 3. NO POWER TO WATER HEATER 4. SILL COCK IS TO BE FLUSH WITH EXTERIOR WALL |
10/09/2009 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE AN OVERFLOW SENSOR ON SECONDARY DRAIN OUTLET 2) USE PURPLE PRIMER PRIOR TO GLUING PVC FITTINGS 3) PROVIDE AN AIR BALANCE REPORT 4) TERMINATE CONDENSATE TO WITHIN 6" OF THE GROUND WITH AN ELBOW AND NIPPLE 5) PROVIDE A GFI SERVICE RECEPTACLE AT CONDENSOR 6) A/C EQUIPMENT TO BE 5 TON AS PER PLANS OR PROVIDE LETTER FROM ARCHITECT OR ENGINEER |
12/08/2009 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* 1) OK ELECTRIC |
12/08/2009 | OUTDOOR LIGHTING FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
12/08/2009 | ELECTRIC - CONSTRUCTION POWER | RHOLLAND | Approved | IVRS - Inspection :* |
12/08/2009 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection :* |
01/29/2010 | MECHANICAL - PROGRESS | MRAMBER | Approved | IVRS - Inspection :* |
07/15/2010 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
12/13/2010 | FIRE - FINAL | DSIWARSKI | Approved | |
12/28/2010 | SIGN - FINAL | MHENSON | Approved | IVRS - Inspection :* |