Permit: T02CM05567
Permit Details
Apply Date:
12/03/2002
Applicant:
TIM BURNS
Description:
NEW:HIGH SCHOOL
Contractors:
- DIVISION II CONSTRUCTION COMPANY
- HEERY INTERNATIONAL INC ,
Permit Reviews
Permit Number - T02CM05567
Permit Status: C of o
Permit Description: NEW:HIGH SCHOOL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/13/2003 | RESUBMITTAL | 05/01/2003 | COMPLETED |
| 04/25/2003 | RESUBMITTAL | 05/09/2003 | COMPLETED |
| 08/05/2003 | REVISION | 08/05/2003 | COMPLETED |
| 08/05/2003 | REVISION | 08/21/2003 | COMPLETED |
| 09/09/2003 | RESUBMITTAL | 09/16/2003 | COMPLETED |
| 12/03/2002 | COMMERCIAL NEW | 02/14/2003 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T02CM05567
Permit Description: NEW:HIGH SCHOOL
Total Completed Inspections - 41
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2003 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection 0000*/ 1) OK UFERS ALL BLDGS |
| 06/10/2003 | EXCAVATION/LAYOUT REBAR & ZON | AMATHIES | Approved | IVRS - Inspection 0000*/ 1) BLDG "E" FTGS OK 2) BLDG "D" 1010-OK |
| 06/16/2003 | STEM WALL/RETAINING WALL | AMATHIES | Approved | IVRS - Inspection 0000*/ 1) A & E |
| 08/01/2003 | PLUMBING - YARD WTR LINE/TEST | TRINIVJR | Approved | 1) YARD WATER LINE FROM 5" OF METER LOCATION TO BLDG SERVICE IS OK 2) NOTE: MUST SEE FINAL CONNECTION TO METER 4) OK TO BACKFILL TRENCH |
| 08/01/2003 | BUILDING PRE-SLAB | AMATHIES | Approved | IVRS - Inspection 0000* 3RD LIFT D 1ST LIFT B |
| 08/07/2003 | FIRE SPKLR - UG, PIPING, HYDRO | JEGAN | Approved | IVRS - Inspection 0000* NEED FLUSH |
| 08/10/2003 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 08/21/2003 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection 0000*/1) 4" SADDLE TAP OK. 2) 4" ABS SEWER TO Z WAY CLEAN OUT AT BLDG OK. 3) OK TO BACKFILL. 4) WATER TEST OK. |
| 09/05/2003 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection 0999* |
| 09/09/2003 | REINFORCED MASONRY PRE-GROUT | AMATHIES | Approved | IVRS - Inspection 0000* BLD "E" TOP OUT |
| 10/07/2003 | ROOF NAILING | RSUBA | Approved | IVRS - Inspection 0000* |
| 10/16/2003 | FRAMING | AMATHIES | Approved | IVRS - Inspection 0000* BLD A & E OK |
| 10/22/2003 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection 0000*/ BLDG 'E' |
| 10/29/2003 | PLUMBING - ABOVE CEILING | TRINIVJR | Approved | IVRS - Inspection 0000*/ OK FOR GRID AND TILE. |
| 10/30/2003 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | IVRS - Inspection 0000*/ 1) SOIL WATER TEST IS OK 2) OVERHEAD WATER DISTRIBUTION IS OK 3) NOTE: THIS INSPECTION IS FOR BLDG E ONLY |
| 10/30/2003 | SHEET ROCK NAILING | AMATHIES | Approved | IVRS - Inspection 0000* BLD "E" |
| 11/07/2003 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection 0000*/ 1) GREASE TRAP INSTALLED PER PLAN AS NOTED ON PLIL. 2) OK TO BACKFILL. |
| 12/04/2003 | PLUMBING - GAS PRESS TEST FNL | TRINIVJR | Approved | IVRS - Inspection 0000*/ 1) FINAL CONNECTIONS TO GAS PACK UNITS IS OK. 2) A UTILITY CLEARANCE BOND HAS BEEN POSTED. 3) GAS LINE HAS BEEN BONDED. |
| 12/10/2003 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection 0000*/ NOTES: PRIOR TO RELEASE OF POWER FOR TEMP POWER FOR TEST, DO THE FOLLOWING: 1) WATER AND GAS BONDS MUST BE TIED IN 2) NEED TO VERIFY NEUTRAL BOND LINK IN SES FOR CONNECTION 3) PROVIDE LETTER TO ? FOR SES 4) ALL BLDGS MUST HAVE UFER GROUND SYSTEM TIED IN TO DIST. PANELS IN ELECTRIC ROOMS |
| 12/11/2003 | MECHANICAL - TEMP PWR FOR TEST | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 12/11/2003 | PLUMBING - PROGRESS | TRINIVJR | Approved | IVRS - Inspection 0000*/ OK FOR TEMP POWER. GAS LINE HAS BEEN BONDED. |
| 12/11/2003 | BUILDING - TEMP POWER FOR TEST | AMATHIES | Approved | IVRS - Inspection 0000* |
| 12/15/2003 | PLUMBING - TEMP POWER FOR TEST | TRINIVJR | Approved | |
| 12/15/2003 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | SUBJECT TO BOND POSTING AT CITY. - PLEASE CLEAR SERVICE UPON BOND POSTING. |
| 12/15/2003 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection 0000* |
| 12/23/2003 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | |
| 12/23/2003 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | |
| 12/24/2003 | PLUMBING - FINAL | TRINIVJR | Approved | IVRS - Inspection 0999*/ 1) MUST STRAP DOWN EXPANSION TANK. 2) MUST CUALK ALL FIXTURES. 3) ONLY ONE SLIP JOINT ALLOWED ON TRAP ARM FOR SINK IN ADMIN BLDG. 4) NO C.O. FOR HAND SINK IN KITCHEN. 5) TRIPLE COMPT SINK REQUIRES A TRAP. 6) ART RM SINK TRAP ARM EXCEEDS 135o. 7) ART RM SINK REQUIRES C.O. 8) T&P DRAIN RQUIRES 90o. |
| 12/26/2003 | SIGN - FINAL | DJOHNSTO | Approved | IVRS - Inspection 0000* |
| 12/26/2003 | ENGINEERING - FINAL | JSALINE | Approved | C OF O DENIED. 1. SITE NOT READY FOR INSPECTION. |
| 12/26/2003 | BUILDING - FINAL | AMATHIES | Approved | IVRS - Inspection 0000* |
| 12/29/2003 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 12/29/2003 | MECHANICAL - PROGRESS | CWILLIAM | Approved | |
| 12/29/2003 | MECHANICAL - HOOD SYSTEMS | CWILLIAM | Approved | |
| 12/29/2003 | MECHANICAL - HOODS | CWILLIAM | Approved | |
| 12/31/2003 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | |
| 12/31/2003 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection 0000*/ INSTALL PANEL SCHEDULES. |
| 01/06/2004 | FIRE - FINAL | JEGAN | Approved | IVRS - Inspection 0000* |
| 01/06/2004 | FIRE SPKLR - FINAL | JEGAN | Approved | IVRS - Inspection 0000*/ 1) OK C OF O |
| 01/06/2004 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 01/07/2004 | PERMIT FINALED | AMATHIES | Approved |