Permit: DP22-0254
Permit Details
Apply Date:
09/07/2022
Applicant:
Barbara Brown
Description:
Site/Grading - Dunkin Donuts/Baskin-Robbins. New restaurant with drive-thru.
Permit Reviews
Permit Number - DP22-0254
Permit Status: Complete
Permit Description: Site/Grading - Dunkin Donuts/Baskin-Robbins. New restaurant with drive-thru.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/07/2022 | DEV PKG - OK TO SUBMIT | 09/23/2022 | COMPLETED |
09/23/2022 | DEV PKG | 10/20/2022 | ACTIVE |
10/28/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/30/2022 | REQUIRES RESUBMIT |
01/17/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 03/24/2023 | APPROVED |
06/20/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/20/2023 | REQUIRES RESUBMIT |
04/05/2024 | AS-BUILT v.1 | 04/16/2024 | APPROVED |
08/17/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 09/18/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0254
Permite Description: Site/Grading - Dunkin Donuts/Baskin-Robbins. New restaurant with drive-thru.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/28/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | Contractors not on site. Gates are locked./the contractor called me and I met up with him at 11:50 went over the plans and informed him that he needed to call it every two weeks or as needed. I also gave him a set of detail plans for the trash enclosure. |
03/05/2024 | PDSD Site/Engineering Division - NPPO | N/A | Not Applicable | |
03/05/2024 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0254
Permit Description: Site/Grading - Dunkin Donuts/Baskin-Robbins. New restaurant with drive-thru.
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2024 | PDSD Site/Engineering Division - Landscaping | Passed | All (8) 15 gal. Desert Museum Hybrids are in place per approved Landscape plan locations. All (9) Rio Bravo shrubs are in -lace per approved Landscape plan locations. All (2) 5 gal. Desert Spoon shrubs are in place per approved Landscape plan locations. All (15) 1 gal. Gould Mound shrubs are in place per approved Landscape plan locations. All basin and water harvesting stations locations are completed per approved landscape plan. |
|
03/05/2024 | COT - ENGR - Signage Final | Passed | Verified in panel (P) located at the NW interior corner of building circuit 46 (A) is for exterior signs. Verified in panel (P) circuit 35 (A) is for directional signs and circuits 10 (A) &12 (A). Verified circuit 16 (A) is the drive thru menu board. Verified all 20 amp breakers. |
|
03/05/2024 | SITE - Zoning Final | Passed | ||
03/05/2024 | SITE - Stormwater Final Inspection | Passed | ||
03/05/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | All (8) 15 gal. Desert Museum Hybrids are in place per approved Landscape plan locations. All (9) Rio Bravo shrubs are in -lace per approved Landscape plan locations. All (2) 5 gal. Desert Spoon shrubs are in place per approved Landscape plan locations. All (15) 1 gal. Gould Mound shrubs are in place per approved Landscape plan locations. All basin and water harvesting stations locations are completed per approved landscape plan. |
|
03/05/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
03/05/2024 | COT - ENGR - Site - Assurance Release | Passed | ||
03/05/2024 | ENGR - Drainage Structures | Passed | ||
03/05/2024 | SITE | Passed | ||
03/05/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
03/05/2024 | SITE - Stormwater Follow-up | Passed | ||
03/05/2024 | SITE - Stormwater Setup and Controls | Passed | ||
03/05/2024 | SITE - SWPPP Correction Notice | Passed | ||
03/05/2024 | COT - ENGR - Stormwater | Passed | ||
03/27/2024 | ENGR Engineering Final | Passed |