Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/04/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
2nd lift grout all vertical and horizontal bond beam rebar present. |
| 01/17/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
#4 horizontal rebar for both trash enclosure floors is present per COT drawing and specifications and is ready for concrete pour. |
| 03/05/2024 |
ENGR - Drainage Structures |
|
Passed |
|
| 10/18/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
All horizontal and vertical rebar in place for SW trash enclosure footers, okay to pour. |
| 12/29/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
4’ lift of block is completed with all horizontal ladder bar reinforcement and #4 vertical rebar present, ready for grout. |