Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/05/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
|
| 08/28/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
Contractors not on site. Gates are locked./the contractor called me and I met up with him at 11:50 went over the plans and informed him that he needed to call it every two weeks or as needed. I also gave him a set of detail plans for the trash enclosure. |