Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2024 | PDSD Site/Engineering Division - Landscaping | Passed | All (8) 15 gal. Desert Museum Hybrids are in place per approved Landscape plan locations. All (9) Rio Bravo shrubs are in -lace per approved Landscape plan locations. All (2) 5 gal. Desert Spoon shrubs are in place per approved Landscape plan locations. All (15) 1 gal. Gould Mound shrubs are in place per approved Landscape plan locations. All basin and water harvesting stations locations are completed per approved landscape plan. |