Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
Permit Number - DP22-0254
Inspection Description - ENGR Engineering Final
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2024 | ENGR Engineering Final | Partial Pass | TC Of O level 2 DG to be added to SE corner of drive thru leading to Eegees pedestrian walkway prior to recall of inspection. Patio wrought iron railing is on site and to be mounted to concrete this week and recall of inspection when completed. (2) trash enclosures doors will be installed this week and recall of inspection when completed. |
|
03/05/2024 | ENGR Engineering Final | Partial Pass | TC Of O level 2 DG to be added to SE corner of drive thru leading to Eegees pedestrian walkway prior to recall of inspection. Patio wrought iron railing is on site and to be mounted to concrete this week and recall of inspection when completed. (2) trash enclosures doors will be installed this week and recall of inspection when completed. |
|
03/08/2024 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 The trash enclosure doors will be installed Saturday the 8th and the patio wrought iron will also be mounted to concrete and will recall inspection when completed. | |
03/13/2024 | ENGR Engineering Final | Passed | ||
03/27/2024 | ENGR Engineering Final | Passed |