Permit: DP22-0102
Permit Details
Status:
Issued
Type:
Development Package
Address:
4501 E SPEEDWAY BL
Address NEW:
4501 E SPEEDWAY BL
Apply Date:
04/21/2022
Applicant:
Doug Crane
Description:
Site/Grading/Swppp - Take Five Oil Change Facility.
Permit Reviews
Permit Number - DP22-0102
Permit Status: Issued
Permit Description: Site/Grading/Swppp - Take Five Oil Change Facility.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/21/2022 | DEV PKG - OK TO SUBMIT | 05/05/2022 | COMPLETED |
| 05/05/2022 | DEV PKG | 07/29/2022 | COMPLETED |
| 08/16/2022 | DEV PKG - RESUBMITTAL | 09/21/2022 | COMPLETED |
| 09/29/2022 | DEV PKG - RESUBMITTAL | 10/03/2022 | COMPLETED |
| 09/29/2023 | DEVELOPMENT PACKAGE NEW v.1 | 11/28/2023 | APPROVED |
| 02/15/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 02/17/2023 | REQUIRES RESUBMIT |
| 02/28/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 04/05/2023 | APPROVED |
| 11/29/2023 | DEVELOPMENT PACKAGE NEW v.1 | 01/08/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP22-0102
Permite Description: Site/Grading/Swppp - Take Five Oil Change Facility.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | Precon inform the contractor to schedule inspections to every two weeks. I gave the contractor the details for the trash enclosures. Inspected the site there is no waddles on site they need to install the waddles contractor said he would by next week. |
| 03/09/2023 | SITE - SWPPP Violation Notice | N/A | Not Applicable | use Stormwater follow up for future follow up inspections. |
| 04/28/2023 | SITE - SWPPP Correction Notice | N/A | Not Applicable | |
| 08/02/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time |
| 08/02/2023 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | call tractor did not put knock out so we can see the grout coming out at every 32 inches where there is a piece of rebar contractor informed me that he will take photos after he drills out the holes |
| 08/03/2023 | ENGR Grading Final | N/A | Not Ready | on site construction vertical for building, only. grade minimal. |
Completed Inspections
Permit Status: Issued
Permit Number: DP22-0102
Permit Description: Site/Grading/Swppp - Take Five Oil Change Facility.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2024 | SITE - Stormwater Final Inspection | Passed | ||
| 04/10/2024 | SITE - Stormwater Follow-up | Passed | ||
| 04/10/2024 | SITE - Stormwater Setup and Controls | Passed | ||
| 04/10/2024 | COT - ENGR - Signage Final | Passed | ||
| 04/10/2024 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 04/15/2024 | ENGR Engineering Final | Passed | ||
| 04/11/2024 | PDSD Site/Engineering Division - Landscaping | Passed |