Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
| 01/25/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Entire fence line areas need to have trash and loose debris removed. | |
| 03/06/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
| 04/10/2024 | SITE - Stormwater Follow-up | Passed | ||
| 04/19/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Doug with Dodge contracting | |
| 04/28/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Doug | |
| 07/28/2023 | SITE - Stormwater Follow-up | Partial Pass | ||
| 08/02/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
| 08/25/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Wattle needs to be adjusted thru out site. | |
| 10/27/2023 | SITE - Stormwater Follow-up | Partial Pass | Fence line is clean with no issues at this time large concrete pile is center of site has areas that have been used as a washout for concrete. | |
| 12/08/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | 12’ center gate panel is removed on west side of perimeter temporary fencing and needs to be replaced site is open. Wattle on West side perimeter needs to be adjusted and re-staked. |