Permit Review Detail
Review Status: Completed
Review Details: DEV PKG
Permit Number - DP22-0102
Review Name: DEV PKG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/05/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 05/09/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Take Five Oil Change Facility – 4501 E Speedway Blvd Development Package (1st Review) DP22-0102 TRANSMITTAL DATE: May 09, 2022 DUE DATE: May 19, 2022 COMMENTS: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 20, 2023. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.1 – Provide the email addressed for the Geotech Engineer listed on sheet 1. 2. COMMENT: 2-06.4.3 – Provide the development package case number, DP22-0102, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 3. COMMENT: 2-06.4.7.A.4 - Identify the existing use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses. 4. COMMENT: 2-06.4.7.A.4 – The Use Specific Standard listed under Zoning and Land Use Note 4 is incorrect. Review UDC Table 4.8-4 and provide the correct Use Specific Standard. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 5. COMMENT: 2-06.4.8.C – The “100’ R/W (EXISTING AND FUTURE)” shown on sheet 3 is not correct. Per COT MS&R Map the future right-of-way for Speedway Blvd is 120’. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 6. COMMENT: 2-06.4.9.F – Provide the zoning for the parcels south of Speedway Blvd. 7. COMMENT: 2-06.4.9.J – As street dedication is not required or proposed and this site is adjacent to a Major Street or Route, and Speedway is not a future width, draw the future MS&R right-of-way line, and clearly delineate the MS&R future curb and sidewalk on the plan. 8. COMMENT: 2-06.4.9.O – Remove the 21’ setback line from the plan and provide a setback dimension from the back of future curb long Speedway to the proposed building, UDC Article 6.4.5.C.2 and Table 6.4.5.C-1. 9. COMMENT: 2-06.4.9.O – Remove the 21’ setback line from the plan and provide a setback dimension from the from the outside edge of the nearest adjacent travel lane along Belvedere Ave. As there is parking along Belvedere the setback is measured from 8’-0” out into Belvedere, UDC Article 6.4.5.C.2 and Table 6.4.5.C-1. 10. COMMENT: 2-06.4.9.Q – The Building Height Allowed listed in the “DEVELOPMENT STANDARDS TABLE” is not correct. Review UDC TABLE 6.3-4.A: DIMENSIONAL STANDARDS FOR THE C-1, C-2, C-3, OCR-1, & OCR-2 ZONES, C-2 Zone and provide the correct height. 11. COMMENT: 2-06.4.9.R – Per TSM Section 7-01.4.A At least one sidewalk is required to a project from each street on which the project has frontage, provide the required sidewalk out to Belvedere Ave. 12. COMMENT: Under “DEVELOPMENT STANDARDS TABLE” you list ‘PUBLIC STREET AND MAJOR ROUTE 57’-6”’, clarify what you mean. If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 05/12/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 05/24/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 05/27/2022 | AWARNER1 | LANDSCAPE | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Planning and Development Services Department, Plans Coordination FROM: Anne Warner, RLA PDSD Landscape/Native Plant Preservation Section PROJECT: Take 5 Oil Change ACTIVITY NO: DP-0102 Address: 4501 E Speedway Blvd Zoning: C-2 Existing Use: Proposed Use: Automotive Service TRANSMITTAL DATE: May 27, 2022 DUE DATE: May 19, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Landscape Review Section comments were addressed. This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting. 1. General Note - UDC 2-10.4.1 Identification and Descriptive Data - All improvements and site information, such as adjacent rights-of-way and property lines, shown on the landscape plan will be identical in size and location to those shown on the base plan (site plan or tentative plat). Should amendments be required to the base plan through the review process, the same amendments will be made to the landscape plan which will then be resubmitted along with the base plan. 2. General Note - Ensure that Zoning and Engineering comments are addressed prior to landscape section approval. 3. The Unified Development Code (UDC) requires all new development or an expansion of less than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10. 4. Please indicate the installation of a private submeter if a separate irrigation meter is not being provided. UDC Technical Standards 4-01.6.1.A.1. 5. Please add a detail to show depressed landscape areas or indicate with notes. 6. Provide a detail to show tree planting with root barrier adjacent to walkways. |
| 06/29/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | Development Package Comments: Sheet 1 1. Please provide 3"x5" space for approval stamp at lower right quadrant for all sheets 2. Site Plan shows trash enclosure area. Please provide waste stream calculation. 3. Symbols shown in legend for existing power pole and proposed bollard look very similar. Please use different symbol. Sheet 2 4. Please label all existing driveways with gates. Indicate whether they are to remain or be removed. 5. Label existing speed limit sign to be remain. 6. Northwest corner (along Belvedere Ave): Please label existing power pole/light pole and indicate to remain or be removed, typical all sheets 7. Please show and label all existing utilities/structures. Indicate whether they are to remain or be removed. Sheet 3 8. Please clarify if Key Note #1 applies to section of curb east of curb return on E Speedway Blvd Sheet 4 9. Please verify proposed TC/FG along Speedway Blvd. and at corner of Speedway Blvd. and Belvedere Ave. The elevations do not look like 6" curb. (Ex: TC=89.81/FG=89.45, only 0.36' = 4" curb). If these elevations are existing, new curb fill-in needs to match existing TC. 10. Please label WSEL elevation for both basins 11. Basin 2: Key note #20 called out without leader. Please review and add leader. 12. Please clarify if the line at the ADA loading zone (next to ADA parking) is a contour line. 13. Please provide additional spot elevation at asphalt/concrete joint for trash enclosure 14. Please indicate if the elevations called out on northernmost Belvedere Ave driveway tie-in point are existing elevations. Sheet 5 15. Please provide abbreviations list for those used in plans, such as BCS. 16. Please clarify if electric meter encroaches into walk. Sheet 8 17. Detail 2: FG=90.55 (near Speedway Blvd) is a low point. Please review and revise. 18. Please provide additional spot elevation at the entrance of the trash enclosure (at Asphalt/Concrete joint) Sheet 12 19. Please label basin volume, top and bottom elevation, 100yr- WSEL, and flow rate. Typical all basins. Sheet 14 20. Some proposed plants are on top of water pipe. Please review. ? Drainage Report Comments: 1. Page 7 - Please provide additional explanation/clarification regarding calibration and verification of the model. At a minimum, the discussion should include model boundary conditions. It initially appeared that the intent of the RAS model was to provide a WSEL lower than the FEMA value, though it became clearer after reviewing the exhibits. Review and Comments provided by third party engineer reviewers under contract with the City of Tucson. For Questions or Concerns contact: Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 07/29/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: Linda Thompson Fri 7/29/2022 2:13 PM REVIEW NOTICE Returned for Corrections: DP22-0102 Site/Grading/Swppp - Take Five Oil Change Facility. 4501 E SPEEDWAY BL FEE BALANCE: $ 3,866.40 Please pay at a minimum, the REVIEW category fees. A payment is required before your next submittal. ONLINE PAYMENTS ** If the online amount doesn't match "Fee Balance" shown above, check back in a few hours ** https://www.tucsonaz.gov/pdsd/fees 1- Click on: Pay Planning & Permit Fees 2- Enter Permit Nbr, example: dp20-0000 (not case-sensitive but a hyphen-dash- is needed) 3- Business/Individual Name: Leave this field blank 4- "Continue" 5- In the Pay column - check the boxes 6- "Continue" YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter 3. UPLOAD A RESUBMITTAL to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Any other documents requested by review staff FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Sharon Beasley, Certified Permit Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |
| 07/29/2022 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Passed | Email from: Nicholas Jordan <Nicholas.Jordan@pima.gov> To: CDRC Tue 7/26/2022 7:53 AM Please remove Pima County Addressing from the review queue for DP22-0102 Take Five Oil Change Facility as it does not require review. Thank you Nicholas Jordan Site Review Project Manager - Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |