Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 03/06/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
|
| 04/10/2024 |
SITE - Stormwater Setup and Controls |
|
Passed |
|
| 07/28/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
|
| 08/02/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
call tractor did not put knock out so we can see the grout coming out at every 32 inches where there is a piece of rebar contractor informed me that he will take photos after he drills out the holes |
| 10/27/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |