Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP22-0102

Parcel: 12212015C


Addresses:

4501 E SPEEDWAY BL

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Setup and Controls Not Ready
03/06/2024 SITE - Stormwater Setup and Controls Partial Pass
04/10/2024 SITE - Stormwater Setup and Controls Passed
07/28/2023 SITE - Stormwater Setup and Controls Partial Pass
08/02/2023 SITE - Stormwater Setup and Controls Partial Pass call tractor did not put knock out so we can see the grout coming out at every 32 inches where there is a piece of rebar contractor informed me that he will take photos after he drills out the holes
10/27/2023 SITE - Stormwater Setup and Controls Partial Pass Provide controls as needed