Permit: DP21-0325
Permit Details
Apply Date:
11/29/2021
Applicant:
Description:
RESTRICTED RECORD** Rev 1 - started 10.24.2025 - adding ramada, updating parking ** Site/Grading - Iglesia de Cristo Church. Addition to building.
Permit Reviews
Permit Number - DP21-0325
Permit Status: Inspections
Permit Description: RESTRICTED RECORD** Rev 1 - started 10.24.2025 - adding ramada, updating parking ** Site/Grading - Iglesia de Cristo Church. Addition to building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/06/2022 | DEV PKG - OK TO SUBMIT | 07/06/2022 | COMPLETED |
| 07/06/2022 | DEV PKG | 08/29/2022 | COMPLETED |
| 11/29/2021 | DEV PKG - OK TO SUBMIT | 12/06/2021 | COMPLETED |
| 10/26/2023 | DEVELOPMENT PACKAGE NEW v.1 | 11/02/2023 | APPROVED |
| 01/30/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/03/2023 | REQUIRES RESUBMIT |
| 05/27/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 06/10/2026 | APPROVED |
| 07/06/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 07/21/2023 | REQUIRES RESUBMIT |
| 02/06/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/26/2026 | REQUIRES RESUBMIT |
| 10/24/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/25/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: DP21-0325
Permite Description: RESTRICTED RECORD** Rev 1 - started 10.24.2025 - adding ramada, updating parking ** Site/Grading - Iglesia de Cristo Church. Addition to building.
Total Outstanding Inspections - 2
Completed Inspections
Permit Status: Inspections
Permit Number: DP21-0325
Permit Description: RESTRICTED RECORD** Rev 1 - started 10.24.2025 - adding ramada, updating parking ** Site/Grading - Iglesia de Cristo Church. Addition to building.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Not ready to pour middle sidewalk or sidewalk area in front of church entryway doors yet. Schedule sidewalk inspection for me to check all these form before pour. Sidewalks from Bantam up to the church adjacent to the walls on either side are at asphalt elevation. This is okay but the rest of plan will be followed. |