Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2026 | Partial Pass | Okay to pour center raised sidewalk with integral curbs and ramp. Sidewalk area in front of main entryway is resolved. 2+/-" space will be left clear for existing weep screed. Everything except the ramps on this sidewalk will be 2.0% or less |
||
| 09/09/2026 | Partial Pass | Sidewalk poured in front of entryway and ramps are correct. I would recommend scheduling a sidewalk inspection to check slopes if a ramp is formed at east entryway. | ||
| 09/15/2026 | Partial Pass | 9/15/26 East entrance at front of building. Sidewalk area and curb ramp complies. -Contractor has question about where light poles are located. They are shown on the plans incorrectly on C6 of previous plan. Are there light poles in the East side parking lot? Also the plans do not show where the outlets or sidewalks scuppers are in the basins at South end of parking lot currently it looks as if when basins are full they would flow over ROW sidewalk. There is a grading sheet in the previous set but there was a revision and changes and grading is not sufficiently defined on revised approved plan. |
||
| 09/17/2026 | Partial Pass | 9/17/27 light pole footer inspection. Footer dimensions and reinforcing correct ground correct conduit correct anchor bolts correct OK to pour eight light poles, pending pictures of two more completed. | ||
| 09/24/2026 | Partial Pass | Okay to pour 7 northside bullnose curbs in main parking lot. Make sure trench for mainline sleave is 18" per detail depth. | ||
| 09/29/2026 | Canceled | |||
| 10/01/2026 | Partial Pass | 7 additional Bullnose curbs forms are correct with radius curb cuts good. Okay to pour curbs. | ||
| 10/13/2026 | Partial Pass | -Okay to pour formed sidewalk to the ROW but trench drain areas at curb/ sidewalk at risk. ROW will be inspected by DTM. -3 Light poles okay to pour. -Grate, frame and trench drain to the three basin inlets needs to be detailed by engineer. Or get the Engineer of Record write a note okaying a traffic rated trench drain that would be acceptable in. I suggest not pouring the curb in this area until trench drain is specified. |