Permit: DP21-0313
Permit Details
Apply Date:
11/22/2021
Applicant:
Description:
*Revision #1 (site modifications) started 6/10/24.* Tentative Plat - Sunshine DTA Adult Day Care Facility.
Permit Reviews
Permit Number - DP21-0313
Permit Status: Complete
Permit Description: *Revision #1 (site modifications) started 6/10/24.* Tentative Plat - Sunshine DTA Adult Day Care Facility.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/05/2022 | TENTATIVE PLAT REVIEW | 07/06/2022 | COMPLETED |
| 07/06/2022 | TENTATIVE PLAT REVIEW | 07/06/2022 | COMPLETED |
| 11/22/2021 | DEV PKG - OK TO SUBMIT | 12/06/2021 | COMPLETED |
| 12/06/2021 | TENTATIVE PLAT REVIEW | 03/01/2022 | COMPLETED |
| 06/10/2024 | DEVELOPMENT PACKAGE NEW v.1 | 07/02/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0313
Permite Description: *Revision #1 (site modifications) started 6/10/24.* Tentative Plat - Sunshine DTA Adult Day Care Facility.
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - SWPPP Correction Notice | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Follow-up | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 10/13/2023 | SITE - SWPPP Violation Notice | N/A | Complete (Recurring) | Walked site with Raul Ibarra all set up and controls are in place and no concerns at this time will recall follow up inspections everybody weeks. |
| 10/13/2023 | ENGR Grading Final | N/A | Not Ready | Will recall inspection when grading work proceeds. |
| 08/14/2024 | N/A | Partial Pass | Ready to pour/grout | |
| 10/28/2024 | Consultation SITE | N/A | Partial Pass | discussed and approved field Chang to walkway to prevent cross slope issue at curb access ramp. |
| 11/18/2024 | N/A | Partial Pass | okay to pour sidewalk on west side of project pending additional compaction. | |
| 11/18/2024 | For trash and recycling enclosures | N/A | Partial Pass | okay to pour slab and apron pending raising forms to provide 2% slope, and 6” thickness. will verify in AM |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0313
Permit Description: *Revision #1 (site modifications) started 6/10/24.* Tentative Plat - Sunshine DTA Adult Day Care Facility.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Walked site with Raul Ibarra and reviewed all site drainage areas on approved plan and he will call follow up inspections every 2 weeks under SWPP. | |
| 08/30/2024 | Passed | |||
| 09/16/2024 | ENGR - Drainage Structures | Passed | ||
| 01/14/2025 | Consultation SITE | Passed | Consultation was completed in reference to the next set of inspection that need to be done. | |
| 04/04/2025 | Passed | |||
| 04/04/2025 | For trash and recycling enclosures | Passed | ||
| 04/04/2025 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 04/04/2025 | ENGR Engineering Final | Passed |