Permit: DP21-0261
Permit Details
Apply Date:
09/29/2021
Applicant:
Kenneth Roberts
Description:
Site/Grading - The Specialists. New building.
Permit Reviews
Permit Number - DP21-0261
Permit Status: In review
Permit Description: Site/Grading - The Specialists. New building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/29/2021 | DEV PKG - OK TO SUBMIT | 10/13/2021 | COMPLETED |
| 10/13/2021 | DEV PKG | 12/27/2021 | COMPLETED |
| 11/13/2024 | DEVELOPMENT PACKAGE REVIEW v.2 | 12/19/2024 | REQUIRES RESUBMIT |
| 02/19/2025 | DEVELOPMENT PACKAGE REVIEW v.4 | 03/14/2025 | APPROVED |
| 05/29/2025 | DEVELOPMENT PACKAGE NEW v.2 | 05/29/2025 | APPROVED |
| 01/06/2025 | DEVELOPMENT PACKAGE REVIEW v.3 | 02/07/2025 | REQUIRES RESUBMIT |
| 10/30/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/05/2024 | REQUIRES RESUBMIT |
| 08/14/2026 | AS-BUILT v.1 | N/A | IN REVIEW |
| 03/26/2025 | DEVELOPMENT PACKAGE NEW v.1 | 04/21/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - DP21-0261
Permit Status: In review
Permit Description: Site/Grading - The Specialists. New building.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/08/2026 | Prior to final - needs review for requests for information, AS-Built will need to be submitted |
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: In Review
Permit Number: DP21-0261
Permite Description: Site/Grading - The Specialists. New building.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2026 | ENGR Engineering Final | N/A | Not Ready | Submit As-Builts and Engineers of Record’s letter of acceptance to the portal. When submitted/accepted the final on the DP can pass. |
Completed Inspections
Permit Status: In Review
Permit Number: DP21-0261
Permit Description: Site/Grading - The Specialists. New building.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Building finished, site work done, landscaping almost done. Water harvesting basin at Northwest corner of site is not deep enough and needs to wrap around to the north to plan. Contractor will email compaction test results at driveway and sidewalks, Email Third-party testing for site wall on east side of the building for footer reinforcing and grout, Resolve issue of 5 foot sidewalk is being blocked by site wall at North east corner of site. When ready schedule engineering final on the DP. |
|
| 07/08/2026 | SITE - Zoning Final | Passed | ||
| 07/17/2026 | ENGR Engineering Final | Passed |