Permit Number: DP21-0261
Parcel: 10411433A

Address:
4342 N WEGNER LN

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.3

Permit Number - DP21-0261
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/07/2025 Site Landscape APPROVED
02/05/2025 Site Zoning APPROVED
02/07/2025 CDRC Post Review Express PENDING ASSIGNMENT
01/30/2025 Commercial Plumbing REQUIRES RESUBMIT 1. Building sewers smaller than 8-inches shall have cleanouts located at intervals of not more than 100-feet of developed pipe length. Reference: Section 708.1.2, IPC 2018.
2. Clarify what appears to be a branch off of the water service located between the 1” water meter and the 1-1/4” reduced pressure backflow preventer. Reference: Section 107.2.1, IBC 2018.
01/08/2025 ROW Engineering Review REQUIRES RESUBMIT Comments note on redlined drawings.

If you have any questions, please contact Richard Leigh at richard.leigh@tucsonaz.gov.
02/04/2025 Site Engineering REQUIRES RESUBMIT 1. Site Plan still shows a depressed curb along the south edge of the onsite vehicular area. Please use a 6 inch curb with curb cuts for water harvesting.
2. The water harvesting volume of 294cf does not satisfy the requirements for retention volume (509cf) or detention volume (675cf). Redesign the basins to achieve the required volume. Basins may be 9 inches deep without infiltration testing, and deeper if infiltration testing supports drawdown will not exceed 12 hours.

Mike Ortiz
michael.ortiz@tucsonaz.gov