Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Building finished, site work done, landscaping almost done. Water harvesting basin at Northwest corner of site is not deep enough and needs to wrap around to the north to plan. Contractor will email compaction test results at driveway and sidewalks, Email Third-party testing for site wall on east side of the building for footer reinforcing and grout, Resolve issue of 5 foot sidewalk is being blocked by site wall at North east corner of site. When ready schedule engineering final on the DP. |