Permit: DP21-0073
Permit Details
Apply Date:
03/22/2021
Applicant:
KEVIN MCCONNELL
Description:
Tentative Plat/FLD - Blackhawk Ranch, Lots 1 thru 310, Block One, Common Areas "A" (natural open spa
Permit Reviews
Permit Number - DP21-0073
Permit Status: Awaiting submittal
Permit Description: Tentative Plat/FLD - Blackhawk Ranch, Lots 1 thru 310, Block One, Common Areas "A" (natural open spa
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/22/2021 | DEV PKG - OK TO SUBMIT | 03/26/2021 | COMPLETED |
03/26/2021 | TENTATIVE PLAT REVIEW | 05/27/2021 | COMPLETED |
08/13/2021 | TENTATIVE PLAT REVIEW | 09/22/2021 | COMPLETED |
11/02/2021 | TENTATIVE PLAT REVIEW | 03/02/2022 | COMPLETED |
06/08/2023 | DEVELOPMENT PACKAGE NEW v.1 | 06/26/2023 | APPROVED |
10/06/2023 | DEVELOPMENT PACKAGE NEW v.1 | 11/13/2023 | REQUIRES RESUBMIT |
05/05/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/06/2023 | REQUIRES RESUBMIT |
01/12/2024 | DEVELOPMENT PACKAGE NEW v.3 | 01/17/2024 | APPROVED |
11/17/2023 | DEVELOPMENT PACKAGE NEW v.2 | 12/13/2023 | REQUIRES RESUBMIT |
09/05/2024 | DEVELOPMENT PACKAGE NEW v.1 | 10/15/2024 | REQUIRES RESUBMIT |
09/05/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 10/15/2024 | IN REVIEW |
Outstanding Inspections
Permit Status: Awaiting Submittal
Permit Number: DP21-0073
Permite Description: Tentative Plat/FLD - Blackhawk Ranch, Lots 1 thru 310, Block One, Common Areas "A" (natural open spa
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/10/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 03/10/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/NEED TO RESCHEDULE.} |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/09/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
06/28/2023 | ENGR Grading Final | N/A | Complete (Recurring) | Contractors installing RCP’s in three separate areas one run has 36 inch RCP. another run has two runs of 24 inch RCP and the third run has a 36 inch RCP all good at this time |
01/12/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | COMPLETE ALL OF THE WORK FOR THIS ITEM BEFORE SCHEDULING THIS INSPECTION. THIS INSPECTION CAN CE DONE FOR THE COMMON AREAS THAT ARE COMPLETE SO THAT IT CAN BE TURNED OVER TO THE HOME OWNERS ASSOCIATION FOR MAINTENANCE. |
12/05/2023 | COT - ENGR - Stormwater | N/A | Partial Pass | Headwall at east end of entrance |
01/10/2024 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | contractors good to pour the footer for the HEADWALL on the east side of the project closest to Wilmont |
07/03/2024 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Complete (Recurring) | The 4th basin in from Wilmot is holding water approximately 15hrs after a rain event. several to 8’’ were observed. I spoke with Billy Dykus and they are going to have the civil do some bore holes to try to resolve the issue. This will also be done in the large basin in phase 2 as that is also holding water and right now there is no drainage coming in from street inlets. |
08/06/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Both large basins are holding water well past the 24 hr mark. Billy is working with civil to come up with a fix for these issues. |
Completed Inspections
Permit Status: Awaiting Submittal
Permit Number: DP21-0073
Permit Description: Tentative Plat/FLD - Blackhawk Ranch, Lots 1 thru 310, Block One, Common Areas "A" (natural open spa
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2023 | SITE - SWPPP Correction Notice | Passed | ||
10/09/2023 | SITE - SWPPP Violation Notice | Passed | ||
10/09/2023 | COT - ENGR - Signage Final | Passed | ||
01/16/2024 | COT - ENGR - Stormwater | Passed | ||
08/27/2024 | Grading Progress ENGR | Passed | Billy has asked for a 75% release of the complete project assurance. |