Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 01/10/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
contractors good to pour the footer for the HEADWALL on the east side of the project closest to Wilmont |
| 01/17/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
This inspection was completed on January 17th, it was for a headwall inspection just west of Wilmot on the north side of the street. A partial pass was done as a storm water and control inspection as there was nothing in the system for them to use for this. |
| 03/12/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
|
| 03/26/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
Picture taken of area for slurry pour. Will return on 3/27/24 to retake and look after pour is completed. |
| 06/08/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
No concerns at this time |
| 06/21/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Contractor is installing 42 inch RCP’s. The trench is not Wide enough. Contractor does not have a set of plans or a set of cut sheets on site. Until he gets a set of plans or a set of cut sheets. He can continue. |
| 07/17/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
No concerns at this time |
| 10/09/2023 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
In process |
| 12/21/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
No concerns at this time |