Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 01/10/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
contractors good to pour the footer for the HEADWALL on the east side of the project closest to Wilmont |
| 01/17/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
This inspection was completed on January 17th, it was for a headwall inspection just west of Wilmot on the north side of the street. A partial pass was done as a storm water and control inspection as there was nothing in the system for them to use for this. |
| 03/12/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
|
| 03/26/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
Picture taken of area for slurry pour. Will return on 3/27/24 to retake and look after pour is completed. |
| 06/08/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
No concerns at this time |
| 06/21/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Contractor is installing 42 inch RCP’s. The trench is not Wide enough. Contractor does not have a set of plans or a set of cut sheets on site. Until he gets a set of plans or a set of cut sheets. He can continue. |
| 07/17/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
No concerns at this time |
| 10/09/2023 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
In process |
| 12/21/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
No concerns at this time |