Permit: DP21-0073

Parcel: 14044559A


Addresses:

7720 S WILMOT RD

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Setup and Controls Not Ready
01/10/2024 SITE - Stormwater Setup and Controls Partial Pass contractors good to pour the footer for the HEADWALL on the east side of the project closest to Wilmont
01/17/2024 SITE - Stormwater Setup and Controls Partial Pass This inspection was completed on January 17th, it was for a headwall inspection just west of Wilmot on the north side of the street. A partial pass was done as a storm water and control inspection as there was nothing in the system for them to use for this.
03/12/2024 SITE - Stormwater Setup and Controls Partial Pass
03/26/2024 SITE - Stormwater Setup and Controls Partial Pass Picture taken of area for slurry pour. Will return on 3/27/24 to retake and look after pour is completed.
06/08/2023 SITE - Stormwater Setup and Controls Partial Pass No concerns at this time
06/21/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Contractor is installing 42 inch RCP’s. The trench is not Wide enough. Contractor does not have a set of plans or a set of cut sheets on site. Until he gets a set of plans or a set of cut sheets. He can continue.
07/17/2023 SITE - Stormwater Setup and Controls Complete (Recurring) No concerns at this time
10/09/2023 SITE - Stormwater Setup and Controls Not Ready In process
12/21/2022 SITE - Stormwater Setup and Controls Complete (Recurring) No concerns at this time