Inspection Status: Complete (Recurring)
Inspection History: COT - BASN - Drainage/Basin - Condition Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2024 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Complete (Recurring) |
The 4th basin in from Wilmot is holding water approximately 15hrs after a rain event. several to 8’’ were observed. I spoke with Billy Dykus and they are going to have the civil do some bore holes to try to resolve the issue. This will also be done in the large basin in phase 2 as that is also holding water and right now there is no drainage coming in from street inlets. |