RESTRICTED RECORDS: SITE/GRADING/SWPPP - Tucson Airport Center (TAC 2), new shell building, phases one and two.

Permit Reviews

Permit Number - DP20-0173
Permit Status: Complete
Permit Description: RESTRICTED RECORDS: SITE/GRADING/SWPPP - Tucson Airport Center (TAC 2), new shell building, phases one and two.
Start Date Submittal Complete Date Status  
02/21/2022 DEV PKG - OK TO SUBMIT 02/21/2022 COMPLETED Review Details
02/21/2022 REVISION - - 1ST 04/27/2022 COMPLETED Review Details
03/05/2021 DEV PKG - RESUBMITTAL 03/22/2021 COMPLETED Review Details
06/09/2022 REVISION - - 1ST 07/15/2022 COMPLETED Review Details
08/03/2022 REVISION - - 1ST 09/13/2022 COMPLETED Review Details
09/02/2020 DEV PKG - OK TO SUBMIT 09/15/2020 COMPLETED Review Details
09/08/2020 DEV PKG 10/27/2020 COMPLETED Review Details
11/13/2020 DEV PKG - RESUBMITTAL 01/21/2021 COMPLETED Review Details
12/30/2021 DEV PKG - OK TO SUBMIT 02/21/2022 COMPLETED Review Details
08/28/2023 DEVELOPMENT PACKAGE REVIEW v.3 09/20/2023 APPROVED Review Details
03/06/2023 DEVELOPMENT PACKAGE REVIEW v.2 04/03/2023 REQUIRES RESUBMIT Review Details
06/14/2023 DEVELOPMENT PACKAGE REVIEW v.2 06/15/2023 REQUIRES RESUBMIT Review Details
04/24/2023 DEVELOPMENT PACKAGE REVIEW v.3 04/25/2023 APPROVED Review Details
05/08/2023 DEVELOPMENT PACKAGE REVIEW v.1 05/10/2023 REQUIRES RESUBMIT Review Details
02/07/2023 DEVELOPMENT PACKAGE REVIEW v.1 02/14/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP20-0173
Permite Description: RESTRICTED RECORDS: SITE/GRADING/SWPPP - Tucson Airport Center (TAC 2), new shell building, phases one and two.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
06/27/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 06/27/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN NO CONCERNS AT IS TIME.

} ; {Activity date: 06/27/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN NO CONCERNS AT IS TIME.} ; {Activity date: 06/27/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN NO CONCERNS AT IS TIME.} ; {Activity date: 06/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ INSTALLING 8" STORM DRAIN PIPE ON THE EAST SIDE OF BUILDING.
6818 S COUNTRY CLUB RD} ; {Activity date: 06/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ INSTALLING 8" STORM DRAIN PIPE ON THE EAST SIDE OF BUILDING.
2830 E MEDINA RD} ; {Activity date: 06/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ INSTALLING 8" STORM DRAIN PIPE ON THE EAST SIDE OF BUILDING.
2985 E ELVIRA RD} ; {Activity date: 06/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THE WALK THROUGH OF THE SITE.
6818 S COUNTRY CLUB RD} ; {Activity date: 06/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THE WALK THROUGH OF THE SITE.

2830 E MEDINA RD} ; {Activity date: 06/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THE WALK THROUGH OF THE SITE.
2985 E ELVIRA RD} ; {Activity date: 06/01/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN / NO CONCERNS AS OF TODAY.} ; {Activity date: 05/16/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN / NO CONCERNS AS OF TODAY.} ; {Activity date: 05/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN .GOOD AS OF TODAY.
6818 S COUNTRY CLUB RD} ; {Activity date: 05/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN .GOOD AS OF TODAY.
2830 E MEDINA RD} ; {Activity date: 05/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN .GOOD AS OF TODAY.
2985 E ELVIRA RD} ; {Activity date: 04/28/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AT IS TIME.
6818 S COUNTRY CLUB RD} ; {Activity date: 04/28/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AT IS TIME.
2830 E MEDINA RD} ; {Activity date: 04/28/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AT IS TIME.
2985 E ELVIRA RD} ; {Activity date: 04/26/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN GOOD AT IS TIME.
2985 E ELVIRA RD} ; {Activity date: 04/26/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN GOOD AT IS TIME.
2830 E MEDINA RD} ; {Activity date: 04/26/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN GOOD AT IS TIME.
6818 S COUNTRY CLUB RD} ; {Activity date: 04/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /INSTALLING STORM DRAINAGE PIPE 32" AND 15".
6818 S COUNTRY CLUB RD} ; {Activity date: 04/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /INSTALLING STORM DRAINAGE PIPE 32" AND 15".
2830 E MEDINA RD} ; {Activity date: 04/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /INSTALLING STORM DRAINAGE PIPE 32" AND 15"
2985 E ELVIRA RD} ; {Activity date: 04/11/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ INSTALLING 30 “ ON THE WEST SIDE OF PROJECT AND 8’ STORM DRAIN PIPE ON THE EAST SIDE OF PROJECT OUT LETS} ; {Activity date: 04/07/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /INSTALLING 15” STORM DRAIN PIPE ON THE NORTH END OF PROJECT.

2830 E MEDINA RD} ; {Activity date: 04/07/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /INSTALLING 15” STORM DRAIN PIPE ON THE NORTH END OF PROJECT.

2985 E ELVIRA RD} ; {Activity date: 04/07/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /INSTALLING 15” STORM DRAIN PIPE ON THE NORTH END OF PROJECT.

6818 S COUNTRY CLUB RD} ; {Activity date: 04/05/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ INSTALLING 100’ 15” STORM DRAIN PIPE ON THE NORTH END OF PROJECT.

6818 S COUNTRY CLUB RD} ; {Activity date: 04/05/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ INSTALLING 100’ 15” STORM DRAIN PIPE ON THE NORTH END OF PROJECT
2830 E MEDINA RD} ; {Activity date: 04/05/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ INSTALLING 100’ 15” STORM DRAIN PIPE ON THE NORTH END OF PROJECT.
2985 E ELVIRA RD} ; {Activity date: 04/01/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ 18” STORM DRAIN PIPE. NORTH END OF PROJECT.} ; {Activity date: 03/29/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION.

6818 S COUNTRY CLUB RD} ; {Activity date: 03/29/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION.

2830 E MEDINA RD} ; {Activity date: 03/29/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION.
2985 E ELVIRA RD} ; {Activity date: 03/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /BACKFILL FOR 24" STORM DRAIN PIPE STATION 38 .

2830 E MEDINA RD} ; {Activity date: 03/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /BACKFILL FOR 24" STORM DRAIN PIPE STATION 38 .

2985 E ELVIRA RD} ; {Activity date: 03/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /BACKFILL FOR 24" STORM DRAIN PIPE STATION 38 .

6818 S COUNTRY CLUB RD} ; {Activity date: 03/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN INSTALLING 24" STORM DRAIN PIPE.

2830 E MEDINA RD} ; {Activity date: 03/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN INSTALLING 24" STORM DRAIN PIPE.

2985 E ELVIRA RD} ; {Activity date: 03/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN INSTALLING 24" STORM DRAIN PIPE.

6818 S COUNTRY CLUB RD} ; {Activity date: 03/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN NO CONCERNS S OF KNOW.

6818 S Country Club Rd} ; {Activity date: 01/19/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CONCERNS AS OF TODAY.
2830 E MEDINA RD} ; {Activity date: 01/19/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CONCERNS AS OF TODAY.
6818 S COUNTRY CLUB RD} ; {Activity date: 01/19/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /THING LOOKS GOOD AS OF TODAY.
2985 E ELVIRA RD} ; {Activity date: 12/17/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues or concerns at this time.
6818 S COUNTRY CLUB RD}
12/21/2022 PDSD Site/Engineering Division - NPPO N/A Complete (Recurring) There is still barrel cactuses that need to be installed planted
12/21/2022 COT - ENGR - Signage Final N/A Not Ready Partial of the sign final
03/05/2024 ENGR Engineering Final N/A Partial Pass (2) concrete sections of West rear center of parking lot each 48’x54’ will be poured tomorrow for center section and Thursday for North end section.

Will recall inspection on Friday the 8th of this week.
10/25/2023 PDSD Site/Engineering Division - Landscaping N/A Partial Pass Landscape is completed Rip Rap areas are hand placed with filter fabric in place, will need to do a complete count of and verify shrub and tree species at site engineering final inspection.

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0173
Permit Description: RESTRICTED RECORDS: SITE/GRADING/SWPPP - Tucson Airport Center (TAC 2), new shell building, phases one and two.
Total Completed Inspections - 8
Date Description Inspector Results Comments
12/21/2022 SITE - Stormwater Setup and Controls Passed
12/21/2022 SITE - Stormwater Final Inspection Passed
01/13/2023 PDSD Site/Engineering Division - NPPO Passed N/A
01/13/2023 COT - ENGR - Signage Final Passed N/A
03/06/2024 PDSD Engineering Division Pre-Construction SITE Passed
03/15/2024 ENGR Engineering Final Passed
03/21/2024 PDSD Site/Engineering Division - Landscaping Passed Landscape invoice collected and verified.
03/22/2024 ENGR Grading Final Passed