Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP20-0173
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | Not Ready | ||
12/17/2021 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partial approval. Unscheduled courtesy inspection for Gilbert Chavez at 392-4859 with Chase builders. Please schedule Stormwater follow up inspections biweekly and intermediate inspections daily once the site contractor begins Stormwater piping installations and grading activities. Call for rebar inspections for all Stormwater catch basins and trash enclosure as well as all curbs and sidewalks within property boundaries. Call for a landscape inspection prior to installing landscape materials. 6818 S COUNTRY CLUB RD |
12/17/2021 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Denied | Entered by NGARCIA3 - Denied. Contractor has not yet scheduled a preconstruction meeting. Project is underway at this time. No contact information available. Chase builders. 2985 E ELVIRA RD |
01/13/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Complete everything on the side as shown on the approved plans prior to reschedule this for a final inspection this will include all previously disturbed areas will need to have Hydro seed or DG all parking lot so I have to be paid all landscaping will have to be completed and all excess material has been removed from the site | |
03/06/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
09/28/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | inform the contractor to call in every two weeks. Scope of work is to remove the existing asphalt and replace it with concrete and add bumper curbs with rebar in it. | |
10/11/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Walked site with Roy from Caldwell Watza and approved 250’ of Truck Apron Bump Curb reinforced with continuous #4 rebar and calling for 4000 psi concrete. | |
12/21/2022 | PDSD Engineering Division Pre-Construction SITE | Passed |