Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP20-0173
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
10/05/2022 | PDSD Site/Engineering Division - Landscaping | MHERNANDEZ | Continued | Entered by VVERA1 - CN LANDSCAPE IS STILL IN PROGRESS |
01/13/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | complete all the work is shown on the approved plans prior to rescheduling this inspection for the final. This will include remove all excess material from the site, remove all excess barrel cactus and plants from the side that are not needed for the NPPO. Complete the western parking lot as shown on the approved plans or provide Or provide approve revised drawings for all changes that are anticipated. Hydro seed or place DG in an overall areas that have been disturbed during this site construction that do not have stabilized material on them at this time | |
02/21/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Still need verification of the (15) barrel cactus and (1) ocotillo located in nursery at NW corner of property. Viewed grading for 135” x 48’ NW section of parking located to the North side of fuel station, concrete to be poured on 02/22/24. |
|
03/06/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Will recall Friday the 8th when invoice is available. | |
03/21/2024 | PDSD Site/Engineering Division - Landscaping | Passed | Landscape invoice collected and verified. | |
10/25/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Landscape is completed Rip Rap areas are hand placed with filter fabric in place, will need to do a complete count of and verify shrub and tree species at site engineering final inspection. | |
12/21/2022 | PDSD Site/Engineering Division - Landscaping | Complete (Recurring) | There are barrel cactus that need to be planted |