Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
2545 E SPRING ST
Address NEW:
2545 E SPRING ST
Apply Date:
04/09/2020
Applicant:
Earl Yousey
Description:
SITE - Spring Triplex, 2545 E. Spring Street.

Permit Reviews

Permit Number - DP20-0076
Permit Status: Complete
Permit Description: SITE - Spring Triplex, 2545 E. Spring Street.
Start Date Submittal Complete Date Status  
04/09/2020 DEV PKG - OK TO SUBMIT 04/10/2020 COMPLETED Review Details
04/09/2020 DEV PKG 05/05/2020 COMPLETED Review Details
05/20/2020 DEV PKG - RESUBMITTAL 06/17/2020 COMPLETED Review Details
08/27/2021 DEV PKG - OK TO SUBMIT 09/03/2021 COMPLETED Review Details
09/03/2021 REVISION - - 1ST 09/14/2021 COMPLETED Review Details
12/11/2020 DEV PKG - RESUBMITTAL 12/15/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0076
Permit Description: SITE - Spring Triplex, 2545 E. Spring Street.
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/13/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 07/13/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED}
08/16/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/16/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 07/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTRACTOR CALL IN AND WOULD LIKE TO RESCHEDULE AT A LATER DAY} ; {Activity date: 07/16/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09190, 09031, 09160. Not ready. Work in progress. Parking spaces are 16 feet in length, plan specifies 18 feet. Depress all landscape areas as shown on plan ensure basins are installed to elevation specified. Complete all work and remove debris from site.}
08/24/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/24/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/21/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN. THE LANDING IS BUILT PER DAVID ROBERTS INSTRUCTION.} ; {Activity date: 07/16/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09028. 09180. Partially approved. Stake trees properly, depress landscaped areas as shown. Install ground coverings specified.

}
09/16/2021 ENGR Engineering Final Passed {Activity date: 09/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - 09027, 09160, 0919o. Approved. Please change permit status to final.

} ; {Activity date: 08/16/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED PENDING REVISED DRAWING APPROVAL FOR ALL MODIFICATION MADE TO THE ORIGINALLY APPROVED DRAWINGS} ; {Activity date: 07/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTRACTOR CALL IN AND WOULD LIKE TO RESCHEDULE AT A LATER DAY} ; {Activity date: 07/16/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09190, 09031, 09160. Not ready. Work in progress. Parking spaces are 16 feet in length, plan specifies 18 feet. Depress all landscape areas as shown on plan ensure basins are installed to elevation specified. Complete all work and remove debris from site.}
09/16/2021 SITE - Stormwater Final Inspection Passed {Activity date: 09/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - 09027, 09160, 0919o. Approved. Please change permit status to final.

} ; {Activity date: 07/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTRACTOR CALL IN AND WOULD LIKE TO RESCHEDULE AT A LATER DAY} ; {Activity date: 07/16/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09190, 09031, 09160. Not ready. Work in progress. Parking spaces are 16 feet in length, plan specifies 18 feet. Depress all landscape areas as shown on plan ensure basins are installed to elevation specified. Complete all work and remove debris from site.}
03/03/2022 ENGR Grading Final Passed {Activity date: 03/03/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/02/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - . Continued. Chip with dirt works at 337-7522. Planning to start grading and move seven trees to the nursery area. Has an N0I.
Permit has been approved but not yet this year. Chip will consult with Builder.

}

Documents

File Name Document Type  
1-6 OF 6.PDF DEVELOPMENT PACKAGE VIEW
ONLINE SUBMITTAL PAGE, RECVD 08.27.21.PDF DOCUMENTS VIEW
R1-LETTER, REVISION.PDF DOCUMENTS VIEW
PERMIT DOCUMENTS VIEW
LETTER, COMMENT RESPONSE, 05.20.2020.PDF DOCUMENTS VIEW
ELEVATIONS.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW