Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by VVERA1 - 09027, 09160, 0919o. Approved. Please change permit status to final.
|
| 08/16/2021 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by RSALDAT1 - CONTINUED PENDING REVISED DRAWING APPROVAL FOR ALL MODIFICATION MADE TO THE ORIGINALLY APPROVED DRAWINGS |
| 07/19/2021 |
ENGR Engineering Final
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTRACTOR CALL IN AND WOULD LIKE TO RESCHEDULE AT A LATER DAY |
| 07/16/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - 09190, 09031, 09160. Not ready. Work in progress. Parking spaces are 16 feet in length, plan specifies 18 feet. Depress all landscape areas as shown on plan ensure basins are installed to elevation specified. Complete all work and remove debris from site. |
| 09/16/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by VVERA1 - 09027, 09160, 0919o. Approved. Please change permit status to final.
|
| 08/24/2021 |
ENGR Engineering Final
|
DROBERTS |
Correction Required |
Entered by DROBERT5 - PRIOR TO SCHEDULING THIS INSPECTGION THE DEVELOPMENT PACKAGE FOR THIS SITE WILL NEED TO BE REVISED FOR ALL CHANGES THAT HAVE BEEN MADE TO THE SITE. ONCE THESE REVISIONS HAVE BEEN APPROVED BY ENGINEERING AND ZONING WE WILL CONSIDER THE APPROVAL OF THE BUILDING PERMIT FOR OCCUPANCY. |
| 07/19/2021 |
ENGR Engineering Final
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTRACTOR CALL IN AND WOULD LIKE TO RESCHEDULE AT A LATER DAY |